19
A
S
II
Us
ers
G
ui
d
e
|
1/
24
/2
0
19
General Use
This section describes the standard operation procedures for using the AS II.
1 Power on the AS II.
2 Choose/verify the program for the fiber diameter/coating.
3 Allow the heater time to reach the operating temperature and stabilize
(5
– 10 min)
.
Loading the fiber
4 Open the safety shield to the AS II.
5 Load a fiber across both clamps.
a Make sure that the fiber is flat and taught.
b Make sure that the fiber length passes the buttons.
6 Press both buttons simultaneously.
7 Close the safety shield.
The display will read
Press Start