background image

 

USB232/485/422   

Interface Converter 

Quick Installation Guide 

 

3onedata Co., Ltd. 

Address:  3/B, Zone 1, Baiwangxin High Technology 

Industrial Park, Song Bai Road, Nanshan 
District, Shenzhen, 518108, China 

Website: 

www.3onedata.com 

Tel: 

+86 0755-26702688 

Fax: 

+86 0755-26703485 

Package Checklist

 

Please check whether the package and accessories are intact 
while using the device for the first time. 

1.  Interface converter 

2.  Quick installation guide 

3.  CD 

4.  Warranty card 

5.  Certification 

6.  AM USB Head / AM USB 

Head Converter Line 

If any of these items are damaged or lost, please contact our 
company or dealers, we will solve it ASAP. 

Product Overview

 

The product is a data exchange interface converter between 
USB and RS-232/485/422, model is USB232/485/422 (1 USB 
port +1 RS-485/422/232 serial port +1 9~48VDC power 
supply). 

Panel Design

 

 

Left view 

 

 

Right view 

 

 

Top view 

 

 

Front view, rear view 

 

 

1.  USB Type A female head interface 
2.  Power input 

9~48V

 

3.  RS-485/422 terminal block 
4.  RS - 232 DB9 male head 
5.  Wall Mounting lug 
6.  Power indicator 
7.  Serial port receiving data indicators 
8.  Serial port transmission data indicators 

Mounting Dimension

 

Unit: mm 

 

Notice before mounting:

 

 

Don't place or install the device in area near water or 
moist, keep the relative humidity of the device 
surrounding between 5%~95% without condensation. 

 

Before power on, first confirm the supported power 
supply specification to avoid over-voltage damaging the 
device. 

 

The device surface temperature is high after running; 
please don't directly contact to avoid scalding. 

Notice before power on:

 

 

Power ON operation: First insert the power supply 
terminal  block into the device power supply interface, 
and then plug the power supply plug contact and power 
on. 

 

Power OFF operation: First, remove the power plug, 
and then remove the wiring section of terminal block. 
Please pay attention to the above operation sequence. 

Reviews: