10
Flashing
Network in activity statues
OFF
Did not established effective network connection
RX
Flashing
In receiving data
OFF
None data receive
TX
Flashing
In transmitting data
OFF
None data transmit
2.8 Installation
Before installation, confirm that the work environment meet the installation require, including
the power needs and abundant space. Whether it is close to the connection equipment and other
equipments are prepared or not.
1. Avoid in the sunshine, keep away from the heat fountainhead or the area where in intense EMI.
2. Examine the cables and plugs that installation requirements.
3. Examine whether the cables be seemly or not (less than 100m) according to reasonable scheme.
4. Screw, nut, tool provide by yourself.
5. Power: redundant 12~48VDC or 100~240VAC power input
6. Environment
:
working temperature -40
~
75
℃
Relative humidity
5%
~
95%
DIN-Rail Installation
In order to use in industrial environments expediently,
IES618-4D adopts 35mm DIN-Rail
installation, the installation steps as follows:
1. Examine the DIN-Rail attachment
2. Examine DIN Rail is firm or not and the position is suitable or not.
3. Insert the top of the DIN-Rail into the slot just below the stiff metal spring.
4. The DIN-Rail attachment unit will snap into place as shown below.
Wiring Requirements
Cable laying need to meet the following requirements,
1.
It is needed to check whether the type, quantity and specification of cable match the requirement
before cable laying;
2.
It is needed to check the cable is damaged or not, factory records and quality assurance booklet
before cable laying;
3.
The required cable specification, quantity, direction and laying position need to match
construction requirements, and cable length depends on actual position;
4.
All the cable cannot have break-down and terminal in the middle;
5.
Cables should be straight in the hallways and turning;
6.
Cable should be straight in the groove, and cannot beyond the groove in case of holding back