3onedata ES209G-1GF Installation Manual Download Page 1

 

ES209G-1GF   

Unmanaged Ethernet Switch Quick 

Installation Guide 

 

 

3onedata Co., Ltd. 

Address: 

3/B,  Zone  1,  Baiwangxin  High  Technology 

Industrial 

Park, 

Xili, 

Nanshan 

District, 

Shenzhen 

Website: 

www.3onedata.com 

Tel: 

+86 0755-26702688 

Fax: 

+86 0755-26703485 

Package Checklist

 

Please check whether the package and accessories are intact 

while using the switch for the first time.   

1. 

Industrial Ethernet switch 

2. 

Certification 

3. 

Quick installation guide 

4. 

Warranty card 

5. 

DIN-Rail mounting attachment 

6. 

Terminal 

blocks 

If any of these items are damaged or lost, please contact our 

company or dealers, we will solve it ASAP. 

Product Overview

 

The product is full Gigabit unmanaged DIN-Rail Ethernet 

switch. Module as follows: ES209G-1GF (8 Gigabit copper 

ports + 1 Gigabit fiber port). 

Panel Design

 

 

Rear view, Top view and Bottom view 

 

 

Front view and Side view 

 

1. 

Location hole for wall mounting 

2. 

DIN-Rail mounting kit 

3. 

DIP switch 

4. 

Power input terminal block 

5. 

Grounding screw 

6. 

1000Base-X Gigabit Ethernet fiber port 

7. 

Power supply input status indicator 

8. 

10/100/1000Base-T(X) Ethernet port 

9. 

Interface indicator 

Mounting Dimension

 

Unit: mm 

 

Attention before mounting:

 

 

Don't place or install the device in area near water or 

moist, keep the relative humidity of the device 

surrounding between 5%~95% without condensation. 

 

Before power on, first confirm the supported power 

supply specification to avoid over-voltage damaging the 

device. 

 

The device surface temperature is high after running; 

please don't directly contact to avoid scalding. 

DIN-Rail Mounting

 

For convenient usage in industrial environments, the product 

adopts 35mm DIN-Rail mounting, mounting steps as below: 

 

 

Check if the DIN-Rail mounting kit is installed firmly. 

Step 1

 

Insert the bottom of DIN-Rail mounting kit (one side 

Step 2

with  spring  support)  into  DIN-Rail,  and  then  insert 

the top into DIN-Rail. 

Reviews: