
59
3D SYSTEMS, INC
.
PN:80-D27 Rev.B
7 . Push the carriage to the end position, then close the airlock door .
8 . Check that the Hirth clamping system of the sintering piston is clean . If not, clean it with the use of a brush and/or the
vacuum cleaner .
9 . Execute the
Plate Loading
cycle on the control panel (see "Step 4 : Loading plate" on page 41) : the whole plate will
be placed automatically on the sintering piston .
Zero sintering search
Operations described below complement and follow on from the Preparation Assistant "Step 5 : Zero sintering" on page
42 .
The zero research is performed with the roller . Please ensure :
The sintering plate must be clean . No dust must be located on its surface . The roller should not get in
touch with any powder during this cycle . Make sure to keep a clean area as described on the section
"Unloading a plate" on page 64
1 . Check the sintering plate is clean . If not, clean it with the use of the vacuum cleaner .
2 . Execute the
Zero sintering
cycle on the control panel (see "Step 5 : Zero sintering" on page 42) .
3 . The zero sintering value will then be displayed (1) .
1