APPENDIX B: PRE-INSTALLATION PREPARATION CHECKLIST
The following list helps you to prepare for your ProX 950. Prior to scheduling the installation appointment with a 3D Systems
representative, complete the checklist and fax it to your 3D Systems Customer Support Engineer.
Is there an adequately rated forklift available
during installation to move the equipment to its
destination?
Have you coordinated the move with your shipping
department?
Is there adequate doorway and hallway clearance
to move system components using available mov-
ing equipment?
Is adequate space available for the equipment and
supplies? (See “
” starting on Page 3)
Is the site prepared properly (according to the
“
S
” on Page 3 of this guide)?
Are the following electrical power outlets in place?
For the ProX 950 : Do the electrical power
requirements meet the specifications in “
For service and other uses: Are there two ad
-
ditional outlets, 110/220 V?
I
n the room where the ProX 950 will be installed
does the air conditioning meet the following
requirements?
Is there a minimum cooling capacity of 3.6 kW
in the room
?
Is the temperature change less than 1°C
(1.8°F) per hour?
Is humidity maintained at an appropriate non-
condensing level for the resin (20-50%)?
Does the air change two to five times per
hour?
Is 10/100/1000BASE-T Ethernet network cabling
installed and in working order?
Is a cabinet available to store resin containers?
Does the room have a door that can be closed and
locked during installation?
Is there a network connection? (Optional)
Is there a telephone line? (Optional)
MOVING EQUIPMENT AND SITE ACCESSIBILITY
Is adequate space available for the equipment and
supplies? (See
9)
Is all construction to floors, ceilings, and walls
complete and does it meet local building code
specifications? Are floors clean and free of debris?
Are floors easily cleanable with solvents?
Have you decided what other equipment, acces
-
sories, and supplies that you want to have with
the ProX 950 ? Have you decided on a location for
these items? (Refer to
Has a compressed air connection with a pres
-
sure controller and fast closing connection been
installed? (Optional for parts finishing)
Is a workbench available that has negative pres
-
sure and electricity for power hand tools?
Are electrical outlets and power available?
Is there a 110/220V outlet available for the Pro
-
Cure UV Curing chamber?
Are there enough 110/220V outlets available in the
room for equipment and tools?
Have you installed the duct (if required) for ventila
-
tion of the ProCure UV Chamber?
Is all the recommended safety equipment avail-
able, including nitrile gloves and wipes?
WASTE DISPOSAL AND SAFETY
Has a local waste disposal company been arranged
for periodic pickup of waste materials?
JOB SUBMISSION
(Workstations and Network Access)
Has 3D Systems software been loaded on at least
one workstation so that we can submit a build job
to the SLA system?
Is the software loaded?
Is the computer on the network?
FAX this completed page to (803) 324-4311
Completed by:
Customer Representative
Date
Assigned 3D Systems Customer Support
Engineer Forwarded Date