
84
40-D043 Revision C 5-May-17
Leveling Containers
The leveling container, in the right receptacle, is connected to the leveling pump. This bottle Is
used for fine leveling. The resin is moved into and out of this bottle, so do not remove or
replace this bottle. See
.
Refill Containers
The refill containers, in the middle and left receptacle, are connected to the refill pump. Each
bottle moves resin from the refill container into the RDM. See
.
Note: Do NOT remove or replace the leveling container.
Platform Release
After the build is complete, select
Drain Platform
. This function raises
the elevator motion stage to the top
and the locking mechanism
disengages. You can then reach in,
move the platform backward, release
the locking tab, and then slide the
platform back and remove it.