You must complete and sign this form before scheduling installation. The information on this form will be used to
determine the necessary time that 3D Systems personnel will need to complete the installation. In case multiple
printers are to be installed, use 1 checklist for each printer.
Contact name
Phone, email, fax
Phone
Fax
Facility address
Date submitted
Type of installation
Compact setup
Split setup
Equipment and Packaging
Storage requirements completed
Refer to chapter 3
Door to production hall checked
Electricity completed
Argon completed
Compressed air completed
Customer Supplied Equipment
Production Hall Requirements
Height checked, and gate for equipment checked
Refer to chapter 4
Workspace checked
Floor Specifications checked
Safety Requirements
Fire suppression equipment available
Refer to chapter 5
All Personal Protective Equipment available
Waste disposal system established (must comply with all
applicable regulations
Hand tools available
Emergency eyewash station available
9.2 Facility Requirements Checklist - DMP Flex 350