background image

MOBILETT Plus HP

English

Print No.: SPR8-220.091.01.03.02 

Doc. Gen. Date:

03.03

Replaces: SPR8-220.091.01.02.02.

66 53 930

©  Sie mens AG 2003

The reproduction, transmission or
use of this document or its contents
is not permitted without express
written authority. Offenders will be
liable for damages. All rights,
including rights created by patent
grant or registration of a utility
model 

_

or

_

 design,

_

are

_

 reserved.

Kit part No. 65 53 981

Service

Replacement of the inverter

Repair Instruction

Summary of Contents for MOBILETT Plus HP

Page 1: ...roduction transmission or use of this document or its contents is not permitted without express written authority Offenders will be liable for damages All rights including rights created by patent grant or registration of a utility model _or_ design _are_ reserved Kit part No 65 53 981 Service Replacement of the inverter Repair Instruction ...

Page 2: ...evels Disclaimer The installation and service of equipment described herein is to be performed by qualified personnel who are employed by Siemens or one of its affiliates or who are otherwise authorized by Siemens or one of its affiliates to provide such services Assemblers and other persons who are not employed by or otherwise directly affiliated with or autho rized by Siemens or one of its affil...

Page 3: ...tor unit M11 and replace inverter and PROMs 2 4 Final procedures 2 5 3 _______Supplement to Functional Description _____________________________ 3 1 Exposure preparation 3 1 Rotating anode starter 3 1 4 _______Supplement to Maintenance Instructions ___________________________ 4 1 Maintenance test 4 1 5 _______Supplement to Service Instructions _______________________________ 5 1 List of test progr...

Page 4: ...0 4 Contents MOBILETT Plus HP SPR8 220 091 01 Page 4 of 4 Siemens Elema AB Service Rev 03 03 03 SPS UD Solna Sweden This page intentionally left blank ...

Page 5: ...upport engineers 1 Due to the technology used in this equipment setup service and maintenance should be performed only by customer support engineers who have work authorization for MOBILETT Plus Document required 1 Service Instructions for MOBILETT Plus HP Components included 1 The kit part no 65 53 981 contains the following parts Tools required 1 Standard tool kit Time required 1 Replacement of ...

Page 6: ...ries are still con nected and the capacitor is charged If the batteries are con nected the complete system is powered on The capacitors in M10 may still be charged even if the system is switched OFF and the line voltage cable is disconnected Life threatening electric shock hazard exists The capacitors in M10 must be considered charged until the pro tective measures listed in the document Service I...

Page 7: ... P08 Display the message history and P16 Show the exposure counter The procedure is described in the document Service Instructions The information in these programs will be lost after the exchange of PROMs is done Write down the information in the attached tables in chapter Appendix on Page 7 1 and file it under register 10 in the Technical Manual 6 Mains voltage OFF 7 Attach the new warning label...

Page 8: ... 2 and open the battery boxes by loosen three screws 2 Fig 2 4 Replace the old battery boxes Fasten the old top covers and tighten the holding belts Do not loosen the jumpers 1 Fig 3 between the batteries Very high energy is stored in the batteries Life threatening electric shock hazard exists M O B 0 0 3 5 3 Fig 2 2 2 2 1 WARNUNG WARNING MOB00110 Fig 3 1 1 1 ...

Page 9: ...a Sweden Rev 03 03 03 SPS UD Service Replace battery shelves 2 1 Pull out the power conversion unit see chapter with same name in the document Service Instructions 2 Disconnect cable 1 Fig 4 from P24 and P14 on the power conversion unit MOB00347 Fig 4 2 4 4 P11 P40 3 3 3 M11 P42 P16 P24 P14 5 1 ...

Page 10: ...black 2 Fig 5 and red cables 3 Fig 5 to the connector on the upper battery shelf and fasten with new cable ties 9 Insert the battery boxes fasten them with screws and connect the battery plugs to KBATT Install the capacitor unit M11 and replace inverter and PROMs 2 1 Insert the capacitor unit M11 and fasten it with screws 2 Fig 4 2 Cut cable ties 3 Fig 4 Connect the cable 4 Fig 4 to P11 and P40 ac...

Page 11: ...splay approximately 20 minutes 5 Set position 1 on S1 in position OFF 6 Mains voltage OFF 7 Remount the top front and side covers 8 Check the function by making one exposure 9 In the chapters Operation sub chapter Exposure release switch and Display messages sub chapter USE xx Important message in the Instructions for Use check the maximum preparation time If it is 10 seconds change it to 20 secon...

Page 12: ...MOBILETT Plus HP SPR8 220 091 01 Page 6 of 6 Siemens Elema AB Service Rev 03 03 03 SPS UD Solna Sweden 2 6 Replacing the Inverter This page intentionally left blank ...

Page 13: ...ched off and the anode runs freely If the anode looses speed and a frequency 147 Hz is measured the anode is accelerated for 0 75 s These additional pushes are repeated if necessary until the limit of the preparation time 20 s or until the release of an exposure A push is interrupted if an exposure signal is made The anode is up to speed if the pulse frequency ROT is 147 Hz after the run up time o...

Page 14: ...MOBILETT Plus HP SPR8 220 091 01 Page 2 of 2 Siemens Elema AB Service Rev 03 03 03 SPS UD Solna Sweden 3 2 Supplement to Functional Description This page intentionally left blank ...

Page 15: ...ilament test PMF Rotating anode test PMF Capacitor bank and charge test P04 Display test Check whether the display and the LED s light up and whether the buzzer sounds The test will automatically be repeated once P01 Filament test When the test is successfully completed the follow ing message will appear for 4 seconds FIL PASS The filament test was successfully completed P02 Rotating anode test Du...

Page 16: ...MOBILETT Plus HP SPR8 220 091 01 Page 2 of 2 Siemens Elema AB Service Rev 03 03 03 SPS UD Solna Sweden 4 2 Supplement to Maintenance Instructions This page intentionally left blank ...

Page 17: ...ates the anode with a 160 Hz control signal during two seconds After this first acceleration the speed is measured and if necessary a second acceleration of two sec onds is performed When the correct speed is reached the anode will rotate freely for 20 seconds or until the rotation frequency is below 142 Hz before it is braked during 9 sec onds to a stop An error message will be displayed after tw...

Page 18: ...MOBILETT Plus HP SPR8 220 091 01 Page 2 of 2 Siemens Elema AB Service Rev 03 03 03 SPS UD Solna Sweden 5 2 Supplement to Service Instructions This page intentionally left blank ...

Page 19: ...sv bl K61 3 1 2 C100 25u K66 1 2 ROTA ROTB ROT_VAL Speed measurment K5 16 15 17 18 19 20 ROT K53 7 8 4 5 100V u7 5 0AF u5 10A 22V u1 400mA Supply 5V 15V GND 100VDC 100VDCRET Measuring points Rotation board 15V 5V GND 100VDC 100VDCRET Supply voltage ROTA Drive pulse A 180 0 fase angular to ROTB ROTB Drive pulse B 180 0 fase angular to ROTA ROT_VAL During freerunning Control board ROT During freerun...

Page 20: ...1 2 3 4 5 A B C D E F G X037E Siemens Elema AB SPS UD SPR8 220 091 01 02 02 MOBILETT Plus HP Solna Sweden Service ...

Page 21: ...7 1 Siemens Elema AB SPR8 220 091 01 Page 1 of 2 MOBILETT Plus HP Solna Sweden Rev 03 03 03 SPS UD Service Appendix 6 P08 6 P16 6 Total amount of exposures Appearance number Message history ...

Page 22: ...MOBILETT Plus HP SPR8 220 091 01 Page 2 of 2 Siemens Elema AB Service Rev 03 03 03 SPS UD Solna Sweden 7 2 Appendix This page intentionally left blank ...

Page 23: ...LETT Plus HP Solna Sweden Rev 03 03 03 SPS UD Service Changes to previous version 7 Chapter Page Change 0 All Chapter completely revised 1 1 New software version with new article number implemented Article number of this document is changed 2 5 New step 3 ...

Page 24: ...MOBILETT Plus HP SPR8 220 091 01 Page 2 of 2 Siemens Elema AB Service Rev 03 03 03 SPS UD Solna Sweden 8 2 Changes to previous version This page intentionally left blank ...

Page 25: ......

Reviews: