1 Installation

§

  Connect power (24VDC)

§

  Connect the detector lines

§

  Connect reset input (if S3 = ON)

§

  Install the detector bases and the smoke detectors

§

  Prepare for operation with 1 or 2 pipe systems

§

  Connect pipe system or test pipe

2 Set 

Up

Set DIP switches S2 on pcb E596 according to tables below:

Air flow monitoring

Switch 

S2

delay time

Switch 

S2

Range

A(1)

B(2)

C(3)

D(4)

OFF

ON

short

30 s

ON

OFF

small

I

ON

OFF

middle

2 min.

 (standard)

OFF

ON

middle

II

ON

ON

long

15 min.

OFF

OFF

large

III        

(standard)

OFF

OFF

very long

1 h

ON

ON

very large

IV

Fault

Switch 

S3

OFF

Fault not latching        

(standard)

ON

Fault latching until reset

Atmospheric pressure compensation

R28

MP1 (+)

MP2 (-)

see correction table for atm.pressure

or

2,50 V 

(standard)

3 Commissioning

Initializing of airflow monitoring

1.

press button S1 

“Init”

  several times:

for 1 tube system:
for 2 tube systems:

green LED and yellow LED 

left 

flashes

green LED und yellow LEDs 

left and right 

flashes

2.

Fix cover and tighten screws

within the next 2 min.

3.

Initialization active

ca. 20 min., green and yellow LED flashing

4.

Unit ready

green LED on