background image

JH-3500U

INSTALLATION &
OPERATOR’S MANUAL

JH-3500 )

Solar Power Conditioner

Grid - Interactive 1-Phase Inverter for Photovoltaic System

Ver.1.0

MODEL

Page

• Notice for Users in the USA ................................. i

FCC Statement ....................................................... i

• IMPORTANT SAFETY INSTRUCTIONS ............... ii

• Features ................................................................. 1

Outline of Grid - Interactive Home PV system ........ 2
Required Condition for Grid-Interactive Operation ... 3

• Overview of Each Component ............................. 4

• Installation Instructions ....................................... 6

Before Installation .................................................. 6
Location ................................................................. 6
Unpacking Carton Box ........................................... 6
Required tools or items ........................................... 7

• Installing Solar Power Conditioner ..................... 8

• Electrical Connection ......................................... 11

Before Connecting ................................................ 11

• Wiring Solar Power Conditioner ........................ 13

• Connecting to DC Disconnect ............................ 15

• Connecting to AC Disconnect ............................ 17

• Installing Solar Power Conditioner Display ...... 19

• Test  Running ....................................................... 22

Checking DC Voltage from PV Array ..................... 22
Checking AC Voltage from Grid ............................ 22
Test Running ........................................................ 23
Reinstalling Lower Front Panel .............................. 23

• Changing Operating Parameter ......................... 24

• Parameter and its Description ........................... 27

• Trouble Shooting ................................................ 28

• Specification ....................................................... 29

Summary of Contents for JH-3500U

Page 1: ...tallation Instructions 6 Before Installation 6 Location 6 Unpacking Carton Box 6 Required tools or items 7 Installing Solar Power Conditioner 8 Electrical Connection 11 Before Connecting 11 Wiring Solar Power Conditioner 13 Connecting to DC Disconnect 15 Connecting to AC Disconnect 17 Installing Solar Power Conditioner Display 19 Test Running 22 Checking DC Voltage from PV Array 22 Checking AC Vol...

Page 2: ...ion This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instructions may cause harmful interference to radio communications However there is no guarantee that interference will not occur in a particular installation If this equipment does cause harmful interference to radio or television reception which can be determined by turn...

Page 3: ...ecure failure to do so may result in solar power conditioner from heat smoke and or fire Never use the solar power conditioner except for the grid connected photovoltaic hereafter called PV power system Refer all installations of the solar power conditioner to certified personnel only after receiving prior approval from a power company Installation of the solar power conditioner and other devices ...

Page 4: ...This function enables flexible layout of PV modules regardless of the type or the location High efficiency and long operating life The high frequency isolation transformer contributes to light weight of the solar power conditioner The maximum conversion efficiency is more than 92 Equipped with LCD display The LCD display shows the AC output power of the conditioner in real time as well as the accu...

Page 5: ...to the grid through the AC load center When the system produces more energy than is consumed in the home the excess power is supplied to the grid PV String Watt Hour Meter Grid PV Module AC Disconnect AC Load Center DC Disconnect PV Array Solar Power Conditioner JH 3500U Display PV String The JH 3500U incorporates anti islanding protection and meets the requirements of UL 1741 which ensures the cu...

Page 6: ...oner incorporates two functions to detect and prevent islanding operation This is important when the output of the power conditioner and the power consumption of the home are well balanced and the voltage or the frequency of the grid does not change during a power failure resulting in the power failure not detected This is avoided with a passive system that detects a jumping voltage phase and an a...

Page 7: ... Component Solar Power Conditioner 600 450 450 192 11 4 φ28 φ28 φ28 φ28 152 200 100 67 148 192 G DC Terminal Block for PV string DC Input Switch AC Terminal Block Display Jack GFDI Ground Fault Detector Interrupter Fuse ...

Page 8: ... SOLAR POWER CONDITIONER DISPLAY POWER RESET BACK LIGHT DISPLAY MODE BUTTON CO2 BACK LIGHT DISPLAY MODE CO2 POWER RESET SOLAR POWER CONDITIONER DISPLAY LCD DISPLAY PANEL Name of Parts unit mm BUTTON BUTTON BUTTON BUTTON Solar Power Conditioner Bracket 566 452 40 42 2 59 186 125 82 70 70 70 70 70 70 70 71 8 6 5 18 φ 1 2 2 0 φ 6 5 unit mm unit mm ...

Page 9: ... 64 b 2 When the PV array is exposed to light it supplies a DC voltage to this equipment Location The solar power conditioner should be installed outdoors and the solar power conditioner display indoors Installation of these devices in an improper location may cause smoke or fire danger Also refer to the IMPORTANT SAFETY INSTRUCTIONS section on page ii Do not install the solar power conditioner in...

Page 10: ...orque wrench Open end wrench Electric drill Drill bits 6mm 7mm 8 5mm Cord reel Ladder if necessary Stepladder Low voltage gloves Helmet Waste cloth Pencil or pen Cable tie Insulating tape Sealing putty Multimeter Max usable DC voltage more than 400V Frequency counter Ground tester Level Calculator Items Grounding wire AWG 10 Wiring cable refer to page 13 Conduit pipe 3 4 Conduit hubs For 3 4 holes...

Page 11: ......

Page 12: ...the bracket These screws need flat washers At the end Tighten all the screws for hanging completely Remove metal debris created when tightening screws or drilling holes CAUTION Be sure to use the included mounting bracket to insure that the solar power conditioner is water resistant 4 Remove the A screw on the bottom of the solar power conditioner 5 Place the solar power conditioner so that it is ...

Page 13: ...the mounting bracket and the wall with modified silicone sealant Sealing Sealing Sealing 8 Tighten A screw removed on step 3 through the lower hook of the bracket A 9 Confirm that the solar power conditioner is installed securely ...

Page 14: ... Exclusive Cable 40m Photovoltaic Module AWG10 AWG12 or14 AWG10 AWG10 AWG10 or12 15A 15A 240V AC Option Option Option Before Connecting 1 Confirm the setting condition of the components composing the PV power system 1 Confirm that the PV module the DC disconnect the solar power conditioner and the AC disconnect are securely installed CAUTION Installation of the PV module the DC disconnect and the ...

Page 15: ...the DC disconnect switch must be 400V DC or over Grounding terminal must be connected to the PV frame and solar power conditioner AC Disconnect The AC disconnect switch must be capable of disconnecting the 240V 30A AC Supply over current protection fuse of 30A Grounding terminal must be connected to the solar power conditioner and the AC load center Ask SHARP authorized dealer for PV modules or th...

Page 16: ...d cable opening must be capped to keep the enclosure watertight Grounding operation is the responsibility of the certified installer To avoid risk of fire or electrical shock select proper insulation and size for wires To reduce the risk of short circuits during installation or servicing of the solar power conditioner use insulated tools NOTE All electrical installations shall be done in accordanc...

Page 17: ...rt of the front panel of the solar power conditioner 2 Two openings are available for DC disconnect Choose which openings to use and remove the end cap of the opening Don t remove the caps of the openings which are not used DC Disconnect PV Strings AC Disconnect Display Bottom View of Solar Power Conditioner front ...

Page 18: ...er conditioner Each pair should be marked as one pair of cables which are connected to the same PV string when installing the PV array Tape Tape 2 Locate the grounding cable AWG 10 single copper conductor wire from the DC disconnect enclosure This cable should be also located in the same conduit pipe used for the DC cables 3 Remove the jacket of only one of the positive cables black which is conne...

Page 19: ...inal block Return to step 3 to connect the cables 7 If all DC cables are connected to terminal blocks remove the jacket of the grounding cable AWG10 single copper conductor wire in the same way See step 3 8 Locate the grounding cable to the rightmost GND terminal of AC terminal block and tighten the screw firmly to crimp the cable G GND 9 Confirm all the cables are correctly and firmly connected t...

Page 20: ...for AC disconnect 1 Use two AWG 12 cables for AC output single copper conductor wire not included 2 Remove the jacket of only one cable The length of the exposed conductor should be long enough to connect to the AC terminal securely and short enough to avoid touching any part except the terminal See below for detail 13mm 1mm 3 Connect one cable to the L2 terminal of the AC terminal block and tight...

Page 21: ...rimp the wire G GND 6 Confirm that all the cables are correctly and firmly connected to the terminals of the solar power conditioner Confirm that all the screws never move if the connected cable is pulled or bent Tighten all the screws firmly again Make tight 25 year duration high quality connections and terminations ...

Page 22: ...the wire 1 Insert the larger 4 pin connector of the signal cable to the display jack in the solar power conditioner listen for clicking sound that ensures it is locked in place 2 Connect the ground cable to the ground terminal in the solar power conditioner and tighten the installed screw with Phillips screw driver 3 Insert the flat head screwdriver into the slits on the bottom of the display and ...

Page 23: ... a wall refer to Installing Display onto a Wall 1 Insert the cable into the groove on the backside of the display Groove 2 Position the display and tighten by included screws If installed in the dual outlets use A opening for screws and if in the four outlets use B Do not expose the cable to abrasion risk Socket Box B A B A When the procedure is completed hook the top of the front cover on the hoo...

Page 24: ...leave some spacing to hook the display 2 Insert the cable in the vertical groove on the backside of the display If using the upper groove remove the cover of the groove 3 Hook the display at the two screw slots on the backside and secure it down in place When the procedure is completed hook the top of the front cover on the hook of the display and push the bottom side of the cover until you hear a...

Page 25: ... 400V DC 5 Confirm that the reading of the multimeter is more than DC140V 6 Check the voltage and the polarity at all the DC terminal blocks in the same way Checking AC Voltage from Grid 1 Turn on the dedicated breaker for the solar power conditioner on the AC load center 2 Check the voltage of the terminal at the AC disconnect The value should be approx 240 V 60Hz If not check whether the connect...

Page 26: ...yed If d 47 is displayed again the GDFI fuse may be blown because some of the DC connections are incorrect Check the polarity of all the DC wiring 5 Press POWER button of the solar power conditioner display for more than 2 seconds Then STAND BY is displayed and the solar power conditioner starts the operation GRID CONNECTED RUN and the value of the output power are displayed 6 If the operation is ...

Page 27: ...r 1 Stop the power conditioner manually Press POWER button if it is operating STOP will be displayed on the display BACK LIGHT DISPLAY MODE CO2 POWER RESET SOLAR POWER CONDITIONER DISPLAY 2 Remove the front cover of the display Refer to page 22 3 Slide the both of two dip switches to SVC position with a narrow tool The first parameter number and its value appear on the display If the display conti...

Page 28: ...25 4 To change the parameter number press SELECT 5 When the target parameter number is displayed press SETTING to change its value Only parameter numbers 1 2 7 9 11 12 can be changed ...

Page 29: ...26 6 When finished to changing all the target parameter values press ENTRY to save the values 7 When finished slide the both dip switches to INV position 9 Reinstall the front cover of the display ...

Page 30: ...tage stop time 2 4 AC over frequency 0 5 60 5 5 AC under frequency 0 7 6 AC over under frequency stop time 0 1 7 Reversion timer 10 180 150 240 300 8 AC voltage suppression function OFF 9 Islanding protection level 6 9 OFF 10 AC voltage suppression level 50 11 PV system maximum output power 1 0 1 5 2 0 2 5 3 0 3 5 4 0 4 5 5 0 5 5 6 0 12 Transmission address 5 31 59 3 ...

Page 31: ...ted breaker of the distribution board is OFF turn it ON Check the grid if voltage is under 240V between L1 and L2 If DC input voltage is under 135V 1 Confirm DC disconnect switch is ON 2 Confirm that sunlight is enough 3 Confirm that PV module has no problem about receiving sunlight 4 Confirm the wiring of PV module and power conditioner 1 Turn the power OFF and wait until the temperature inside b...

Page 32: ...40 C Conditioner Solar Power 32 F_to_104 F_ 0 C to 40 C Conditioner Display Dimension Solar Power Width x Height x Depth_ 23 62x17 72x7 56_inches _ 600 450 192_mm Conditioner Solar Power Width x Height x Depth_ 5 39x4 61x0 79_inches _ 137 117 20_mm Conditioner Display Weight Solar Power Approx _62_pounds_ Approx 28 kg Conditioner Solar Power 0 5_pounds_ Approx 0 2 kg Conditioner Display Enclosure ...

Page 33: ...Printed in Japan Doc NO 0000 SHARP CORPORATION ...

Reviews: