background image

LGES-5048
LGES-5048-NS
Hybrid Inverter

User Manual

Summary of Contents for LGES-5048

Page 1: ...LGES 5048 LGES 5048 NS Hybrid Inverter User Manual ...

Page 2: ...g 8 2 4 Electrical Wiring Connection 9 2 4 1 PE Cable Connection 9 2 4 2 PV Wiring Connection 10 2 4 3 Battery Wiring Connection 11 2 4 4 On Grid Back up Connection 12 2 4 5 Smart Meter CT Connections 15 2 5 DRED Remote Shutdown Device Connection 17 2 6 WiFi WiFi LAN Module Connection 18 2 7 Earth Fault Alarm Connection 18 03 MANUAL OPERATION 21 3 1 Wi Fi Configuration 21 3 2 Startup Shutdown Proc...

Page 3: ...3 04 OTHER 24 4 1 Error Messages 24 4 2 Troubleshooting 26 4 3 Disclaimer 28 4 4 Technical Parameters 30 ...

Page 4: ...introduction describes a general working situation of the LGES system The operation mode can be adjusted on LGES PV Master App up to the system layout The general operation modes are as below 1 1 Operation Modes Introduction LGES 5048 system normally has the following operation modes based on your configuration and layout conditions Mode I The energy produced by the PV system is used to optimize s...

Page 5: ...he components of the product can be recycled This side up This package must always be transported handled and stored in such a way that the arrows always point upwards No more than six 6 identical packages being stacked on each other Products shall not be disposed as household waste 5min Fragile The package product should be handled carefully and never be tipped over or slung Refer to the operatin...

Page 6: ...warranty commitment for the inverter will be invalid Appropriate methods must be adopted to protect inverter from static damage Any damage caused by static is not warranted by manufacturer PV negative PV and battery negative BAT on inverter side is not grounded as default design Connecting PV to EARTH is strictly forbidden PV modules used on the inverter must have an IEC61730 class A rating and th...

Page 7: ...onditions such as outdoor exposed to sunshine on non combustible material surface 1 Battery Terminal BATTERY 2 PV Input Terminal PV1 PV2 3 DC Switch optional 4 DC Switch Locking Hole 5 Communication Module Port WiFi or LAN 6 METER Communication Port 7 DRED or Remote Shutdown Communication Port 8 BMS Communication Port 9 RS485 Communication Port 10 Reserved Port 11 AC Terminal ON GRID and BACKUP 12...

Page 8: ...ng BLINK 1 Battery is discharging BLINK 2 Battery is low soc is low OFF Battery is disconnected not active GRID ON Grid is active and connected BLINK Grid is active but not connected OFF Grid is not active ENERGY ON Consuming energy from grid buying BLINK 1 Supplying energy to grid zeroing BLINK 2 Supplying energy to grid selling OFF Grid is not connected or system is not operating WiFi ON WiFi co...

Page 9: ...ters One meter cannot be connected to multiple inverters Different CTs cannot connect to the same line cable The On Grid or back up side cannot be connected to any AC generator directly The inverter battery input must not be connected to incompatible batteries The backup side cannot be connected to the grid One battery bank cannot be connected to multiple inverters 2 2 Packing List Upon receiving ...

Page 10: ...on box Rule 9 Leave enough space around the inverter according to the below figure for natural heat dissipation If there is any radio or wireless communication equipment below 30mhz near the inverter make sure that 1 Install the inverter at least 30m far away from the high precision wireless equipment 2 Add ferrite core with multi coil winding or low pass EMI filter to the DC cable or AC cable 300...

Page 11: ...xpansion bolts in the accessory box and tightly attach the mounting bracket to the wall Carry the inverter by holding the heat sink on two sides and place the inverter on the mounting bracket FOR AUSTRALIA ONLY Lock the DC switch before mounting Make sure that the DC switch is locked unless the inverter is powered on Note Bearing capacity of the wall must be higher than 30kg otherwise it may not b...

Page 12: ...nt on the ground terminal after installing the PE cable The PE cable should be prepared by customers Recommended specifications Type single core outdoor copper cable Conductor cross sectional area S 4mm2 The inverters can be locked for anti theft purposes if this is necessary for individual requirements The lock is not included in the package and can be purchased by the user L1 1 2 3 Copper 4mm2 L...

Page 13: ...k before using them Note There are MC4 plugs in the accessory box The connection details are shown below Prepare the PV cables and PV plugs Screw the cap on and plug it into the inverter side Connect the PV cable to the PV connectors Note 1 Please use the PV plugs and connectors from the accessory box 2 The PV cable should be a standard 4 6mm2 Note There will be a clicking sound if the connectors ...

Page 14: ...ly Connect battery terminal onto inverter Note Please make sure polarity of battery are not reversed Note 1 Please use accessories from accessory box 2 Battery power cable should be 35mm2 Tightening Torque 6 8N m Pan Head Screw Screw Cap Insulator Battery Terminal Waterproof Ring Cable For the compatible LG RESU batteries please refer to battery connection in LGES QUICK INSTALLATION INSTRUCTIONS P...

Page 15: ... consume energy to support communications with the inverter 2 4 4 On Grid Back up Connection An external AC breaker is needed for on grid connection to isolate the inverter from the utility grid when necessary The requirements for the on grid AC breaker are shown below Inverter Model AC Breaker Specification LGES 5048 40A 230V e g DZ47 60 C40 LGES 5048 NS 40A 230V e g DZ47 60 C40 Note The absence ...

Page 16: ... Grade Description Value A Outside diameter 13 18 mm B Separated wire length 20 25 mm C Conductor wire length 7 9 mm D Conductor core section 4 6 mm2 Cable Single Hole Seal Ring Connection Terminal Screw Cap AC Cover Insulator 2 3 4 1 Connect the assembled AC cables into AC terminals with fastening torque about 2 0 2 5N m Note Connect back up terminals before connecting on grid terminals Make sure...

Page 17: ... the minimal condition to be considered as the UPS level However some external factors may cause the system failing on back up mode As such we recommend the users to be aware of conditions and follow the instructions as below Do not connect loads when they are dependent on a stable energy supply for a reliable operation Do not connect the loads which may in total exceed the maximum back up capacit...

Page 18: ...ory 2 4 5 Smart Meter CT Connections Make sure the AC cable is totally isolated from AC power before connecting the Smart Meter and CT A Smart Meter with the CT in product box is compulsory for LGES system installation It can be used to detect the grid voltages and current directions provide the operating condition of the LGES inverter via RS485 communications Note 1 The Smart Meter with CT is alr...

Page 19: ...unication is configured by default If 485 communication is used please contact the Technical Support to replace this with the correct communication cable For Three Phase Grid CT A connect to L1 CT B connect to L2 CT C connect to L3 Position Color BMS Function Smart Meter Function EMS 1 Orange white 485_A2 NC 485_A 2 Orange NC NC 485_B 3 Green white 485_B2 485_B1 485_A 4 Blue CAN_H NC NC 5 Blue whi...

Page 20: ...rough DRED Port as the figure shows 2 1 Plug out the 6 pin terminal and dismantle the resistor on it 2 Plug the resistor out leave the 6 pin terminal for next step Note The 6 pin terminal in the inverter has the same function as DRED Please leave it in the inverter if no external device is connected 1 Put DRED cable through the plate 2 Connect DRED cable on the 6 pin terminal The function of each ...

Page 21: ... 4 Connect DRED terminal to the right position onto the inverter 2 6 WiFi WiFi LAN Module Connection 2 7 Earth Fault Alarm Connection The inverter complies with IEC 62109 2 13 9 Fault indicator LED on inverter cover will light up and the system will email the fault information to customer It must be installed in a high traffic area where the LED would be noticed Inverter should be installed at eye...

Page 22: ...n household loads 30A 600V DC Breaker LGES 5048 NS 1 Only for RESU 48V battery which has BMS communication 2 Direction of the CT cannot be connected in reverse please follow House Grid direction to do the connection If the inverter is not equipped with a DC switch LGES 5048 NS an external DC breaker shall be added CT PE N L3 L2 L1 To Battery To Smart Meter Power Meter Grid AC Breaker 5 AC Breaker ...

Page 23: ...erwise the backup function will not work Grounding screw hole in the lower right corner Normal Loads Battery Distribution box Solar Array Backup Loads Grid Smart Meter Hybrid Inverter Grounding screw hole in the lower right corner Normal Loads Distribution box Solar Array Backup Loads Grid Wiring with SP3T Bypass Switch Notice The purpose of SP3T bypass switch is to allow for continued operation o...

Page 24: ... 3 38 2 1 38 60 C5 A8 60 33 E1 Enable Solar WiFi 10 10 100 253 Disable WiFi_Burn in WAP WAP2 PSK AES WiFi_Burn in Cannot join the network may be caused by Add wireless network manually Please enter the wireless network passwork No router weak WiFi signal password is not correct Network name SSID Encryption method Encryption algorithm Password 8 63 bytes show psk Help Wizard will help you to comple...

Page 25: ... WiFi Button Note Wi Fi Reset Restore function is only used when 1 Wi Fi loses connection to internet or cannot connect to LGES PV Master successfully 2 Cannot find Solar WiFi signal or have other Wi Fi configuration problems 3 Please do not use this button if Wi Fi monitoring works well 4 If you need to replace the module please use the unlock tool page 29 3 2 Startup Shutdown Procedure Start up ...

Page 26: ...st export limit 5 Monitor and check the performance of the hybrid system Please download LGES PV Master App User Manual at https www lgessbattery com m au home battery product info lg sn 362 3 3 LGES PV Master App LGES PV Master is an external monitoring configuration application for LGES hybrid inverters used on smart phones or tablet for both Android and iOS system Features include Note For Aust...

Page 27: ...le complies with that required on user manual and the AC cable is not too long b If the voltage is low make sure the AC cable is connected well and the jacket of the AC cable is not compressed into the AC terminal 3 Make sure the grid voltage of your area is stable and within normal range FAC Failure Grid frequency is not within permissible range Inverter detects that the grid frequency is beyond ...

Page 28: ...cables are not connected well on the AC side If it happens only in the early morning dawn rainy days with higher air humidity and is recovered soon it should be normal Relay Check Failure Self checking of relay failure Neutral ground cables are not connected well on AC side or just an occasional failure Check use multi meter if there is high voltage normally should be lower than 10V between N PE c...

Page 29: ... device at the same time you will not be able to connect to the signal Q Why does the Wi Fi module fail to connect to network after I choose the right router hotspot and enter the right passwords A It s possible that there are special characters not supported by module in the hotspot passwords Please modify the password to consist of only Arabic numerals or uppercase lowercase letters About Batter...

Page 30: ... discrepancies between different pages on the APP as well as between these shown on the portal and APP Q Some columns show NA like battery SOH etc Why does that happen A NA means that the App has not received data from the inverter or server because of communication problems such as battery communications and the communications between inverter and the App About the Smart Meter And Power Limit Fun...

Page 31: ... extended warranty is not bought Inverter is installed refitted or operated in improper ways without authority from manufacturer Inverter is installed or used under improper environment or technical condition mentioned in this user manual without authority from manufacturer Installation or configuration of the inverter does not follow requirements mentioned in this user manual The inverter is inst...

Page 32: ... hole if it is not sealed or too big Once a year THDi Test For Australia requirements in the THDi test there should add Zref between inverter and mains L 0 24 Ω j0 15 Ω N 0 16 Ω j0 10 Ω L 0 15 Ω j0 15 Ω N 0 1 Ω j0 1 Ω As needed Wi Fi module Replace or remove the Wi Fi module using the Wi Fi unlock tool module remover which is delivered in the package Remove the communication terminal next to the W...

Page 33: ...S PV String Input Data Max DC Input Power without battery W 6500 Max DC Input Power with battery W 7500 Max DC Input Voltage V 580 MPPT Range V 125 550 Start up Voltage V 125 Min Feed in Voltage V 2 150 MPPT Range for Full Load V 215 500 Nominal DC Input Voltage V 360 Max Input Current A 11 11 Max Short Current A 13 8 13 8 Max Backfeed Current to The Array A 0 No of MPP Trackers 2 No of Strings pe...

Page 34: ...tor 1 Adjustable from 0 8 leading to 0 8 lagging Output THDi Nominal Output 3 AC Output Data Back up Back up Nominal apparent power VA 4600 Max Output Apparent Power VA 4600 Peak Output Apparent Power VA 4 6900 10sec Nominal Output Current A 20 Max Output Current A 20 Max Output Fault Current peak and duration A 43A 0 2s Inrush Current peak and duration A 60A 3us Maximum output overcurrent protect...

Page 35: ...ge 25 60 Relative Humidity 0 95 Operating Altitude m 3000 Cooling Natural Convection Noise dB 25 User Interface LED APP Communication with BMS 5 RS485 CAN Communication with Meter RS485 Communication with Portal Wi Fi Weight kg 30 Size Width Height Depth mm 516 440 184 Mounting Wall Bracket Protection Degree IP65 Standby Self Consumption W 13 Topology Non isolated DC Connector MC4 4 6mm2 AC Connec...

Page 36: ...nd discharge current also depends on the battery 2 When there is no battery connected inverter starts feeding in only if string voltage is higher than 200V 3 4600 for VDE 0126 1 1 VDE AR N4105 NRS 097 2 1 5100 for CEI 0 21 4 Can be reached only if PV and battery power is enough 5 CAN communication is configured by default 6 Not all certifications standards listed check the official website for det...

Page 37: ...Pty Ltd Unit 12 35 Dunlop Rd Mulgrave VIC 3170 Support Tel 1300 178 064 AEST Business hours Support email essserviceau lgensol com www lgessbattery com au https www lgensol com V1 1 2022 04 06 340 00783 00 www lghomebattery com au ...

Reviews: