background image

Please read this manual carefully before operating your 
set and retain it for future reference.  

www.lg.com/global/business/ess

*MFL69509501*

MODEL
ED05K000E00

OPERATING MANUAL

Energy Storage 
System

Document : ESS-01-ED05K000E00-EN-160926

Status : 09/2016

Summary of Contents for ED05K000E00

Page 1: ... carefully before operating your set and retain it for future reference www lg com global business ess MFL69509501 MODEL ED05K000E00 OPERATING MANUAL Energy Storage System Document ESS 01 ED05K000E00 EN 160926 Status 09 2016 ...

Page 2: ...ystems y y There is a risk of electric shock Do not remove cover There is no user serviceable parts inside Refer servicing to qualified and accredited service technician y y Electrical shock hazard Do not touch uninsulated wires when the product cover is removed y y In the event of fault the system must not be restarted Product maintenance of repairs must be performed by qualified personnel or per...

Page 3: ...erload Only connect the proper wire to DC terminal block Refer to the installation wiring diagram for details y y Connect the DC and DC cables to the correct DC and DC terminals on the product y y Do not step on the product or the product package The product may be damaged y y Do not dispose of batteries in a fire The batteries may explode y y Do not open or damage batteries Released electrolyte i...

Page 4: ... DC Coupled ESS LG ESS can achieve higher system efficiency due to simpler power conversion process y y Three Phase Connection 3 phase connection secures phase balancing y y Smart Management With built in Smart PMS it analyses PV generation and load consumption and implements to charge and discharge immediately Also it monitors main system battery conditions to maintain its stable condition always...

Page 5: ...Settings menu 14 Display 14 Date and Time 14 Language 15 Battery 15 System Information 16 Using EnerVu Using EnerVu system 17 Creating a new account 17 Overview of my EnerVu page 19 Making a statistical graph 21 Checking system event 23 Making a statistical report 23 Transferring your system to other owner 24 Appendix Maintenance 25 Cleaning the product 25 Inspecting regularly 25 Contact 25 Dispos...

Page 6: ...aces and services LAN Local Area Network Network that interconnects computers within a limited area IP Internet Protocol A set of rules for sending data across a network Glossary Terms Explanation Azimuth In the Northern hemisphere the azimuth angle indicates by how much degrees the module surface deviates from a full south aspect In the southern hemisphere it indicates the deviation from a full n...

Page 7: ...d part F Lower bracket connected part Left G Lower bracket connected part Right H Lower wall bracket LED indications Power Solar Battery Power Solar Battery Off Power grid is not connected Energy is not being generated Battery is in stop mode Green Power grid is connected Energy is being generated Battery is in charging Red Blink Fault Fault Blue Battery is in discharging ...

Page 8: ...tting Started 8 Lower parts A B C D E F G A PV switch DC Disconnect B PV1 and connectors C PV2 and connectors D Battery DC cable gland E BMS control connector F Meter LAN cable gland G AC grid cable gland ...

Page 9: ...Tab Start or Stop to switch the operation Energy Analysis General Settings Installer Settings Tab Energy Analysis General Settings or Installer Settings to display each menu screen B Displays the daily amount of energy generated from PV Tab button to displays monthly amount of energy generated from PV and monthly amount of reduced CO2 To close the window tab C Displays the daily amount of energy s...

Page 10: ...d Amount of energy from the power grid to household today and this month G Displays current status of power grid Tab to displays detailed status of sold and purchased energy from power grid Power Current grid power Voltage Current grid voltage Frequency Current grid frequency Into Grid Amount of sold energy today and this month From Grid Amount of purchased energy today and this month H Displays c...

Page 11: ...76 2 7 1 0 1 0 1 0 Charging 78 1 0 Charging 78 1 0 1 0 1 0 1 0 1 7 PV to Battery Power generated from PV is being charged in the connected battery Discharging 76 2 7 1 0 1 0 1 0 Charging 78 1 0 Charging 78 1 0 1 0 1 0 1 0 1 7 PV to Grid Power generated from PV is being fed into the grid Discharging 76 2 7 1 0 1 0 1 0 Charging 78 1 0 Charging 78 1 0 1 0 1 0 1 0 1 7 Battery to Load Power of the batt...

Page 12: ...sired menu option on the left side D Tab a desired setting option and set the appropriate value NOTE When this product is turned on for the first time settings in Installer settings menu must be set by authorized service personnel Refer to the Installation manual for more information of installer settings ...

Page 13: ...ay Week Month or Year Batt Graph Analyzes the energy charged and discharged on the battery within selected period and displays as a graph Select Batt Graph on Energy Analysis Charged energy is marked with green discharged energy is marked with purple and current status of the battery is marked with yellow on the line graph You can change the period by tapping Day Week Month and Year A Goes to prev...

Page 14: ...already have been set by the Get time from Internet function the Date Time option will be disabled 1 Select the currently selected value Date setting menu is displayed 2 Adjust Year Month and Day using S or W 3 Select NEXT to complete the date setting and then time setting menu is displayed 4 Adjust Hour Minute and pm am using S or W 5 Select ACCEPT to complete the setting Get time from Internet S...

Page 15: ... on Battery Winter mode Tab this switch to select Enable or Disable If you set this option to Enable the minimum SOC level of the battery is maintained a level of 20 The minimum SOC level of winter mode can be changed by the installer only Winter Mode Period Tab current value to display the setting menu You can change the period 1 Select the currently selected value Period setting menu is displaye...

Page 16: ...formation Displays system information of this ESS You can check information on PCS battery and network status Tab S or W to display next or previous information PCS information Battery and software information Network status information ...

Page 17: ...ed to internet The Network setting menu in the LCD touch panel must be set by the installer Creating a new account A On your browser visit LG EnerVu page at http enervu lg ess com B Select Sign Up The service agreement page appears Read the terms conditions and privacy policy carefully If you agree with every term and condition click the I Agree check box and select AGREE The account creation page...

Page 18: ...ail select CONFIRM to complete the e mail confirmation E On the account creation page select CONFIRM to complete creating your account F Select SIGN IN to go to the SIGN IN WITH LG ACCOUNT page Input your User ID and Password and select SIGN IN G Available LG account services are displayed on the screen ...

Page 19: ...stem has been installed This page provides you Location Displays the location the system has been installed on the map System Log Displays the system fault System Overview Displays the status of the system in real time This page provides you with system information such as current power generated from PV power purchased from grid power charged discharged from the battery ALL the information is ren...

Page 20: ... energy generated consumed sold and purchased on the system The variety of statistical charts are supported on the page On the Event tab you can check the issues occurred on the system System Info Displays information on your system Report You can make a monthly or an yearly report of statistical data for energy management on your system ...

Page 21: ...reen Energy View Makes an overall graph of statistical data PV Graph Makes a graph of statistical data on PV Generation and Grid feed in ESS Graph Makes a graph of statistical data on ESS Charging Discharging and SOC Load Graph Makes a graph of statistical data on household load Consumption and Purchase 2 Select a duration option among Day Month Year or Total 3 Select a date month or year to make ...

Page 22: ...electricity Purchased energy through the power grid GENERATION Direct Consumption Amount of directly used energy from PV Charging Amount of energy that charged to the battery Grid feed in Amount of sold energy to the power grid PV Graph Energy Generation Amount of generated energy from PV Grid feed in Amount of sold energy to the power grid ESS Graph Energy Charging Amount of energy that charged t...

Page 23: ...arning The event list will be filtered by selected type option Making a statistical report You can make a monthly or an yearly report of statistical data for energy on your system 1 Select a report option among PV Report ESS Report Load Report Balance Report or Total Report 2 Select a reporting period option between Yearly report or Monthly report 3 Select desired month or year 4 Select Run Report...

Page 24: ...EnerVu page at http enervu lg ess com Select Sign In The SIGN IN WITH LG ACCOUNT page appears Enter your User ID and Password then select SIGN IN to enter the EnerVu web monitoring system B Select your User ID on top of the screen A menu appears on the screen Select System transfer The system transfer page appears on the screen C Enter the email address of the recipient in the ID field and select ...

Page 25: ...oducts in contact with the product for a long period of time When cleaning the air duct shut off all the systems including PCS PV module battery AC circuit breaker After that open the lower cover of the PCS and remove dust on the air duct using a soft brush Inspecting regularly It is recommended to check the operating status and connection status once a year Contact authorized dealer or where you ...

Page 26: ...purchased the product or contact your local government waste office for details of your nearest authorised WEEE collection point For the most up to date information for your country please see www lg com global recycling Removal of waste batteries and accumulators Product with embedded battery ONLY In case this product contains a battery incorporated within the product which cannot be readily remo...

Page 27: ...cuit current Isc 12 A Current Inrush 73 Aac peak 0 05 ms Max fault current 83 Aac peak 20 ms Max output overcurrent protection 12 A Frequency frequency range 50 Hz 47 5 51 5 Hz Max AC power from PV 5 000 W Max AC power from battery 3 000 W Max output current 8 5 A Total harmonic distortion 5 Phases 3 DC input output Max input voltage 800 V Max DC power 6 600 W Input voltage range MPPT at rated AC ...

Page 28: ...ard charging conditions CC CV Charging current 0 3C 9 45A Condition for termination 232 4 V Standard discharging conditions CC Discharging current 0 3C 9 45A Condition for termination 168 V Feature function Noise emission 40 dB Cooling Forced Convection Topology Transformerless Degree of protection IP21 Max permissible value of relative humidity non condensing 85 Climate class 3K5 Display 7 Touch ...

Page 29: ... to the source code all referred license terms warranty disclaimers and copyright notices are available for download LG Electronics will also provide open source code to you on CD ROM for a charge covering the cost of performing such distribution such as the cost of media shipping and handling upon email request to opensource lge com This offer is valid for three 3 years from the date on which you...

Page 30: ......

Page 31: ......

Page 32: ......

Reviews: