background image

HUAWEI TECHNOLOGIES CO.,  LTD.

OptiX RTN  905 Radio Transmission  System V100

Quick Installation Guide
for Outdoor Cabinets (OMB Cabinets)

Issue: 

01

Date: 

2018-10-30

Summary of Contents for OptiX RTN 905

Page 1: ...HUAWEI TECHNOLOGIES CO LTD OptiX RTN 905 Radio Transmission System V100 Quick Installation Guide for Outdoor Cabinets OMB Cabinets Issue 01 Date 2018 10 30 ...

Page 2: ...ective holders Notice The purchased products services and features are stipulated by the contract made between Huawei and the customer All or part of the products services and features described in this document may not be within the purchase scope or the usage scope Unless otherwise specified in the contract all statements information and recommendations in this document are provided AS IS withou...

Page 3: ...s Failure to do so causes serious injuryor death Non standard and incorrectoperations on the high voltage power supplymayresultin fire and electric shock Do not perform operations on high voltage and AC power supplyfacilities or on a tower or mastin the case of thunderstorm Failure to do so causes serious injuryor death Ground the device before powering iton Failure to do so causes damage to the d...

Page 4: ... Socket w rench Torque w rench Hex key Wire clippers Wire stripper RJ45 crimping tool Diagonal pliers Cold press pliers Needle nose pliers Combination pliers Bayonet w rench Utility knife Claw hammer Hammer drill Marker Ladder Soldering iron ESD gloves Heat gun Multimeter ESD gloves Binding strap Insulation tape ESD w rist strap Impact tool File Vacuumcleaner ...

Page 5: ...ation ports IF port to the ODU DC C power socket FE GE service electrical ports RJ45 connectors 12 13 Alarm input output port NMS COM EXT S1 CLK TOD MON ALMI ALMO GE1 GE2 GE3 GE4 GE5 GE6 TDMA TDMB OptiX RTN 905 2 A STAT SRV PWRA PWRB L A5 L A6 USB RTNB NEGB RTNA NEGA OUT IN OUT IN 48V 60V 1 16 ESD TURN OFF POWER BEFORE WARNING 48V OUTPUT DISCONNECTING IF CABLE OFF ODU 1 ON PULL ODU 2 ON PULL OFF A...

Page 6: ... 3 4 5 6 7 8 9 10 11 13 16 12 14 15 17 19 18 18 Port for the ESD wrist strap 19 STM 1 serv ice ports 1 1 TDM serv ice concatenation ports FrontView of the IDU 905 1E d Ground screw DC C power socket Caution See Precautions for Handling Power Cables NE status indicator 1 2 3 1 2 3 4 5 6 7 8 9 10 11 13 16 12 14 15 17 19 18 Mini USB port FE GE service electrical ports RJ 45 connectors GE FE service p...

Page 7: ... indicators of the GE FE service ports SFP modules 9 USB port Status indicator 10 11 12 NMS port NMS serial port NE cascading port Asynchronous data port Clock port CLK High precision time port TOD Outdoor cabinet monitoring port MON 4 Alarm input output port Power ov er Ethernet port GE FE service ports SFP modules STM 1 serv ice ports 16 17 16xE1 ports 13 14 15 18 COMBO ports Port for the ESD wr...

Page 8: ...the OMB Cabinet FrontView of the OMB Cabinet a Left View of the OMB Cabinet b Right View of the OMB Cabinet c Technical Specifications Dimensions mm 600 H x 240 W x 430 D Ambienttemperature no sunshine radiation 20 to 50 ...

Page 9: ... AC Power Supply Internal Structure of the OMB Cabinet DC Power Supply HEUA OMB cabinet AC power supply Fan assembly external circulating AC DC power supplyfacility PMU module Fan assembly internal circulating HEUA OMB cabinet DC power supply Fan assembly external circulating DCDU 03B Cable trough AC surge protection box ...

Page 10: ...n Scenarios of the Cabinets 1Installation Scenarios of the OMB Cabinet Recommended Requirements of the OMB Cabinet a Minimum Requirementsof the OMB Cabinet b 200 mm 150 m m 600 mm 500 mm 200 mm 300 mm 800 mm 600 mm ...

Page 11: ...t is recommended thatyou use the APM30H or TMC11H cabinetthat is configured with a heater 2Installing the OMB Cabinet Installing the OMB Cabineton a Wall a 210mm 378mm 210mm 378mm Determine the position ofthe backplane on the wall and mark the four anchor points by using a marker Drill the holes and install the expansion boltassembly 55 60mm 90 φ14 3 4 5 6 20 30mm Bolt M10x75 Spring w asher10 Plas...

Page 12: ... wall Install the OMB frame on the backplane Installing the OMB Cabineton a Pole b Install the firstupper fastener assemblyon the pole Flat w asher Spring w asher M10x180 bolt Install the lower fastener assemblyon the backplane M10x40 bolt M6 screw ...

Page 13: ...10 Install the backplane on the pole Install the mounting brackets for the OMB frame Install the OMB frame on the backplane ...

Page 14: ...tdoor Installation Installing the RTN 905 in the OMB Cabinet AC Power Supply a Installing the RTN 905 in the OMB Cabinet DC Power Supply b This installation scenario applies to the RTN 905 This installation scenario applies to the RTN 905 NOTE NOTE ...

Page 15: ...ft side of the surge protection box SLPU 2 Installing the SLPU The SLPU mustbe installed on the rightside of the RTN 905 Ground terminal When installing the RTN 905 ensure that the power module ofthe equipmentis downward The RTN 905 can be installed inside OMB cabinets in the same manner NOTE ...

Page 16: ...OMB cabinet use the same method as thatin the AC powered OMB cabinet The ground cables and signal cables mustbe bound separately or mustbe separated from each other for certain spacing to minimize mutual interference The PGND cables are in yellow green color The general ground cable has a cross sectional area of 16 mm2 Installing the PGND Cables for the RTN 905 b Ground bar NOTE Installing and Rou...

Page 17: ...es are correctly connected to the positive and negative terminals of the power distribution box 2Installing and Routing the Power Cables AC Power Supply For AC OMB cabinets ofVer C connectthe two power cables from RTN 905 to any two power output terminals such as terminals LOAD6 and LOAD7 with the maximum outputcurrentof 30 A For information aboutassembling the easypower receptacle pressfittype co...

Page 18: ...g power cables for the RTN 905 ensure thatthe power cables are correctly connected to the positive and negative terminals of the DC power distribution box 3Installing and Routing the Power Cables DC Power Supply For AC OMB cabinets ofVer C connectthe two power cables from RTN 905 to any two power output terminals such as terminals LOAD6 and LOAD7 with the maximum outputcurrentof 30 A For informati...

Page 19: ...he Service Cables for the Equipment AC Power Supply Installing E1 Cables a Installing EthernetCables b Rubber block FE0 OUT SIDE UFLP INSIDE FE1 FE0 FE1 FE0 OUTSIDE UFLP INSIDE FE1 FE0 FE1 Rubber block E1 cables for 1xAnea 96 4xDB25 conversion are used ...

Page 20: ...17 Installing IF Cables c Installing Fibers d Rubber block Insulation tube Binding strap ...

Page 21: ... vary For details see the hardware description In this case pin 8 of the RJ 45 connector connected to the network interface on the CMUA COMIN board does not need to be connected NOTE RJ 45 Connector of the Network Interface to the Cable on the CMUA COMIN Board RJ 45 Connector CLK TOD MON of the Network Port to the Cable on the RTN 905 Pin 1 TX White Orange Pin 6 RX White Orange Pin 2 TX Orange Pin...

Page 22: ...les a For the details on how to route service cables see Installing the Service Cables for the Equipment AC Power Supply E1 cable transitcable E1 cable lead outcable Ethernet cable transit cable Ethernet cable lead out cable IF cable Monitoring cable Fiber NOTE FE0 FE0 UFLP INSIDE FE1 7 OUTSIDE FE1 5 4 2 1 8 6 3 ...

Page 23: ...nting mode the cabinet is installed securely and does not swing when you shake it 5 The waterproof cover of the bottom port and the hang chains are bound with the surrounding cables 6 The surface of the overall equipment is clean and tidy The exterior paint is intact 7 The door and lock of the cabinet are proper 8 All labels tags and nameplates are correct legible and complete No What to Check For...

Page 24: ...he lugs at both ends of the power cable or PGND cable are soldered or crimped securely 5 Bare wires and lug handles at the wiring terminals are wrapped tightly by using insulation tapes or heat shrink tubings 6 The flat washers and spring washers are mounted securely to all the wiring terminals 7 The connectors of all cables are securely linked especially those at the bottom of the cabinet 8 The c...

Page 25: ... DC powered cabinets Cable hole on the right IF cable Ethernet cable E1 cable Cable hole on the right Fiber Cable hole on the left Any of the holes Any of the holes Any of the holes For cabinets of Ver C the number of cable holes is increased from 7 to 15 Select cable outlets based on requirements For cabinets of Ver C the number of cable holes is increased from 4 to 6 Selectcable outlets based on...

Page 26: ...through the corresponding cable hole on the cable module and ensure thatthe cable connector is idle After routing all the cables through the cable hole on the waterproofcable module connectthe cable connector to the corresponding porton the equipment For information aboutthe position ofthe cable holes cable routes and installation methods see the description ofthe installation procedure NOTE ...

Page 27: ...HUAWEI TECHNOLOGIES CO LTD Huawei Industrial Base Bantian Longgang Shenzhen 518129 People sRepublic of China www huawei com ...

Reviews: