background image

December 2019

© 2019 Honeywell. All rights reserved.

800-25395 - B

                             

MPA2

Access Control Unit

Installation Guide

Release 1.0

Summary of Contents for MPA2

Page 1: ...December 2019 2019 Honeywell All rights reserved 800 25395 B MPA2 Access Control Unit Installation Guide Release 1 0 ...

Page 2: ... information in this document descriptions technical specifications pictures illustrations etc are indicative only not binding and can be changed without notice Nevertheless this document remains valid Personal Data Storage Please be aware that this product can store personal data Personal data is protected by the General Data Protection Regulation 2016 679 in Europe and therefore the owners of pe...

Page 3: ...00 25395 B 1 Installing the MPA2 Panels In this manual Introduction 2 Panel Components and Descriptions 3 Installation 12 System Configuration 46 Hardware Specifications 54 Firmware Specification 59 Basic Standalone Operation 60 Maintenance 61 Troubleshooting 62 Technical Support 63 ...

Page 4: ...the access to a company site 1 2 MPA2 Overview A MPA2 access control is a full featured two door web based access control system The MPA2 panel includes a built in web server built in Ethernet and USB support and Power over Ethernet PoE capability You can manage the access control system using either the built in web browser MAXPRO Cloud MPC or WIN PAK For supported configurations see System Confi...

Page 5: ...hsce international index html For any additional information regarding the compliance of this product to any EU specific requirements please contact Honeywell Security Communications Honeywell Security Quality Assurance Dept Newhouse Industrial Estate Motherwell Lanarkshire ML1 5SB Scotland United Kingdom Tel 44 0 1698 738200 Email UK64Sales Honeywell com 2 0 Panel Components and Descriptions Note...

Page 6: ...4 www honeywell com Installing the MPA2 Panels Panel Components and Descriptions Figure 1 MPA2 Compact Enclosure Wiring and Components ...

Page 7: ...iring 110 220 VAC 50 60 Hz input wiring power line filter wiring and battery backup charger wiring and all other wiring which is power limited Class 2 wiring 2 1 Ferrites All EMC CE FCC compliancy testing was executed using in this manual specified CAT7 F STP cable Emission compliancy tests have been executed using a ferrite on following RJ45 USB connections when used J4 Main Ethernet USB2 Host J1...

Page 8: ...6 www honeywell com Installing the MPA2 Panels Panel Components and Descriptions ...

Page 9: ...xit REX for all doors may be configured for Normally Open or Normally Closed contacts as supervised or non supervised All inputs on the Controller Board and eight additional inputs have default functions but they can be configured for general purpose inputs Board Configuration Terminal Block RJ45 Main Board Rdr Door1 connector P10 GND DoorCnt1 P10 GND DoorCnt Aux1 J12 pin1 3 J13 pin1 3 Main Board ...

Page 10: ...2 2K 4 7K or 10K ohm values Note that both resistors must have the same value In addition the Reader tampers can be supervised and capable of being used as additional inputs if the default functionality is not needed The wire used for the inputs cannot exceed 30 ohms over the entire length of the cable Remember that the distance from the panel to the door must be doubled to determine the total res...

Page 11: ...e access control device Panel inputs are capable of four state supervision Normal Alarm Short and Cut One input is used for door status on each door Inputs for Reader Tampers are supplied as well They can also be used as additional inputs when not required for their default purpose Non supervised inputs are used for Request to Exit button on each door Note For MPA2 reader specifications see Hardwa...

Page 12: ... the 12VDC external power See Hardware Specifications page 54 for further details on current limits using PoE The Standard Enclosure uses a 13 8 VDC 3 5A power supply with an international input of 100VAC to 240VAC The MPA2 also charges and monitors the condition of the battery Wire the unswitched electrical power to the supply per the National Electrical Code as well as any local electrical codes...

Page 13: ...attery The battery provides standby backup power depending upon system configuration and activity When AC is lost the power supply automatically switches to the backup battery for continuous 12VDC power Replace the battery every 2 to 2 5 years or more often if the system has a high rate of backup use Caution MPA2 units should powered by a 120 240 VAC fused line Always disconnect the battery and AC...

Page 14: ...rge ESD 1 Connect the Ethernet cable as shown below 2 Set DIP switch settings for the panel address communication termination and biasing See DIP Switch Settings page 32 3 Check all wiring at this time Caution Improper wiring can cause damage to the MPA2 at power up and result in a loss of warranty 4 Apply power to the panel 5 Check for the Run LED for a successful power up If the LED is blinking ...

Page 15: ... 800 25395 B 13 3 1 Installing the Standard Enclosure Panel Perform the following steps to install the MPA2 Standard Enclosure panel Warning Use a static strap whenever touching the panel to ensure protection from Electrostatic Discharge ESD 1 Optional Remove the green ground wire and the door ...

Page 16: ...14 www honeywell com Installing the MPA2 Panels Installation 2 Install the four power supply screws to mount the PSU to the metal plate ...

Page 17: ...llation Guide Document 800 25395 B 15 3 Connect Mains from the prepared IEC chassis socket USA model only to the PSU terminals PE N L 4 Fit the three Power Supply Screws through the key holes in the left bottom side of the cabinet and seat the power supply by pulling down ...

Page 18: ...16 www honeywell com Installing the MPA2 Panels Installation 5 Connect prepared Low Voltage supply cable RED BLACK to the PSU terminals V V ...

Page 19: ...tion Guide Document 800 25395 B 17 6 Plug Low Voltage 13 8 V cable BLUE connector and the Battery ORANGE connector to the MPA2 Main Board Warning Do not apply power at this time Be sure the power cable is disconnected from the external power source before following this step ...

Page 20: ...18 www honeywell com Installing the MPA2 Panels Installation 7 Plug in the prepared Tamper connectors 1 Off Wall tamper 2 Panel door tamper ...

Page 21: ...Installing the MPA2 Panels Installation MPA2 Access Control Unit Installation Guide Document 800 25395 B 19 8 Connect the battery ...

Page 22: ...Panels Installation 9 Attach the door to the cabinet 10 Re connect the green yellow Ground wire to the cabinet door 11 Power up the MPA2 Controller Board and configure the system Refer to the MPA2 Quick Startup Guide 800 25470 for instructions ...

Page 23: ... to RJ45 J11 on the Controller Board The wires are color coded to their labeled terminals Figure 5 shows a 2 reader pair attached to the reader ports for Door 1 J11 J10 3 2 2 OSDP The MPA2 Access Control panel also supports OSDP readers OSDP Open Supervised Device Protocol is a bi directional RS485 Multi drop AES128 Encrypted protocol The MPA2 provides 2 separate OSDP ports one for DOOR1 and one f...

Page 24: ...ader Entry and one door configuration In case of two reader and one door configuration make sure the Exit reader Reader B is address 01 For OSDP reader addressing settings see reader Instruction Installation Manuals Manufacturer dependent Figure 4 Wiring of Single Reader to the Controller Board Door 1 For color code see info card on the controller card assembly ...

Page 25: ...h 1 to 4 should be OFF for Wiegand in S1 For SW1 Wiegand 1 and 10 should be OFF and OSDP 1 and 10 should be ON Figure 5 Wiring of Multiple Readers to the Controller Board DOOR 1 Warning MPA2 reader connections are using CAT 6E 7 S FTP cable with RJ45 connections Be aware that this is NOT an Internet Ethernet protocol and so should not be mixed or connected to standard Ethernet Network devices as s...

Page 26: ...ows the input output factory default wiring for a one door configuration on the Controller Board Table 5 shows the input output factory default wiring for a two door configuration on the Controller Board Table 6 shows the Factory Default Configuration for Additional Inputs Outputs on the Controller Board Table 4 Factory Default Configuration Settings for Door 1 Table 5 Factory Default Configuratio...

Page 27: ... possible LED control inputs orange for the green LED and brown for the red LED RED is the normal state of the Reader LED operation The LED turns GREEN for two seconds after a valid card read Although readers operate similarly LED control can vary depending on the manufacturer Therefore your readers may require some testing to identify the right LED wire when the reader uses Dual LED wires If you ...

Page 28: ...e door strikes to the Controller Board 1 Use the following figure to locate the door strike terminals on the board and to wire the door strike mag lock according to the power supply used Be sure to use the S4 suppressor kits as shown below Figure 6 Wiring an Access Control Door Lock Request to Exit and Door Contact ...

Page 29: ...he External Power Supply side the Return terminal should not be connected The On Board option is used when jumpers are set for 12VDC The External Power Supply options is used when the jumpers are set to External Power see Jumper Settings page 36 for details For dry configuration types the power supply must be voltage compatible listed to UL 294 or UL 609 for Ul installations and CAN ULC S318 for U...

Page 30: ...ximum of four NX4OUT for a total of six Downstream I O Devices can be added to the downstream bus The Interface bus is wired into the MPA2 using standard RJ45 connection Preferably use CAT 7 S FTP cable J16 on the board Use pin1 2 TRX TRX to connect the NX4 I O boards Make sure the NX4 I O boards are powered with an external 24Vdc Power supply If the MPA2 controller is physically terminating one e...

Page 31: ...9 For additional information concerning the Downstream I O See section Downstream Devices I O 3 4 2 RS485 Panel Downstream bus IN OUT J17 J18 The MPA2 panel has a RS 485 downstream bus for connecting downstream panels MPA2 or NetAXS123 A maximum of 31 MPA2 and or NetAXS123 downstream panels can be connected ...

Page 32: ...rd RJ45 connections on the board J17 IN J18 OUT Preferably use CAT 7 S FTP cable Use pin1 2 TRX TRX to connect the downstream panels Make sure the downstream panels are powered by their local Power supply If the MPA2 controller is physically terminating one end of the RS 485 bus Line S1 positions 7 8 need to be set to ON ...

Page 33: ...lling the MPA2 Panels Installation MPA2 Access Control Unit Installation Guide Document 800 25395 B 31 For additional information concerning the Downstream Panel interface See section Downstream Devices I O ...

Page 34: ...llation 3 5 Setting DIP Switches and Jumpers 3 5 1 Controller Board DIP Switch and Jumper Settings Figure 8 Controller Board DIP Switch and Jumper Location DIP Switch Settings Use the following Figure 9 DIP switch configurations to set up your MPA2 panel ...

Page 35: ...Installing the MPA2 Panels Installation MPA2 Access Control Unit Installation Guide Document 800 25395 B 33 Table 7 MPA2 SW1 DIP Switch 1 10 Settings ...

Page 36: ... Installation MPA2 SW1 DIP Switch 1 10 Settings Continued DIP Switch 4 SW1 does NOT require a panel reboot to take effect This does not affect the USB IP address If the panel will be configured in EVL Mode leave S5 through S9 set to factory default ...

Page 37: ...mand resets the panel to the original factory default values but it only removes the customized databases and restores the original factory default database The Event History is retained To reset the panel to the factory default values 1 Make a note of the existing settings on SW1 and S1 DIP switches 2 While the panel is powered up turn all SW1 DIP switches to the OFF position 3 Power down then po...

Page 38: ...Closed NC relay contacts There is a total of eight 3 pin jumpers two per relay on the Controller Board Figure 9 MPA2 Controller Board Jumpers Each relay is associated with two jumpers As shown below a relay s left jumper configures the relay s load source 12VDC or External and the right relay jumper configures the relay contact type Normally Closed or Normally Open Setting the jumpers to configure...

Page 39: ...Installing the MPA2 Panels Installation MPA2 Access Control Unit Installation Guide Document 800 25395 B 37 ...

Page 40: ... supervised inputs and 16 SPDT relay outputs each input is limited to 2 2K ohms resistance Refer to the individual installation manuals for I O wiring details The Interface bus is wired into the MPA2 using standard CAT6E 7 S FTP UTP cable with RJ45 plug J16 on the board The Interface bus has a fixed baud rate and communicates to the downstream I O devices using a polling technique Each downstream ...

Page 41: ...VDC supply should be used to provide power to all downstream modules and output loads Module Setting Value NX4IN DIP switches Address switches 1 6 1 or 2 Baud rate switches 7 and 8 7 OFF 8 ON OP Mode switches 9 and 10 9 OFF 10 OFF Jumper settings JP1 ON positions 1 and 2 if the module is the last module on the downstream bus OFF positions 2 and 3 if the module is not the last module on the downstr...

Page 42: ...40 www honeywell com Installing the MPA2 Panels Installation Figure 10 Default Downstream I O Configuration with Wiring ...

Page 43: ... Note USB communication requires the USB A to MicroUSB B cable You will need to install a USB driver to support the connection Follow these steps Warning Do NOT connect the USB cable to the panel until AFTER the drivers are installed 1 Insert the MPA2 Product CD into your Windows based computer The MPA2 product menu opens in the web browser Note If the product menu does not open automatically in y...

Page 44: ...USB Drivers on the product menu to start the USB driver installation wizard 3 Click Next to display the Ready to Install the Program screen Note If confirmation dialog boxes pop up before or during the installation click the appropriate boxes to allow or approve the installation ...

Page 45: ...lows the wiring of a Multi drop communication network of up to 4 000 feet 1200 m in length Only one host converter device per dropline is supported Notes MPA2 must be the Primary panel on an existing NetAXS loop The MPA2 panel cannot be placed as a Secondary panel when the Primary is a NetAXS system RS 485 communication has not been evaluated by UL or ULC DIP switch position SW1 3 on the MPA2 pane...

Page 46: ...hat biasing and termination on both ends are present Use the S1 positions 7and 8 ON on both ends of the RS 485 network Note For more information on end of line EOL termination contact Honeywell technical support Note If an RS 485 network has a MPA2 Secondary panel no N1000 II N1000 III N1000 IV or NS2 are allowed on the same network If they are added to a network with a MPA2 Primary panel they wil...

Page 47: ...stallation Guide Document 800 25395 B 45 This configuration supports a total of 31 NetAXS 123 and MPA2 panels per Multidrop line Each MPA2 panel has a port for an Ethernet TCP IP interface The Ethernet TCP IP interface provides 10 100 MB Ethernet support for each panel ...

Page 48: ... SW4 OFF Follow User Configured IP S1 7 8 ON 485 Termination ON EG EG EG EG DIP Switch Settings SW5 9 Panel Address SW6 OFF SW4 OFF S1 7 8 OFF 485 Termination OFF RS 485 Multidrop RS 485 Multidrop Terminal MPA2 Panel MPA2 Panel NetAXS 123 Panel MPA2 Panel NetAXS 123 Panel DIP Switch Settings SW5 9 Panel Address SW3 ON Primary SW4 OFF Follow User Configured IP S1 7 8 OFF 485 Termination OFF DIP Swi...

Page 49: ...em maintenance and troubleshooting Note You should ground each MPA2 Standard Metal Enclosure panel individually with an Earth Ground USB DIP Switch Settings SW5 9 Panel Address SW3 ON Primary SW4 OFF Follow User Configured IP S1 7 8 ON 485 Termination ON DIP Switch Settings S1 S5 Panel Address S6 OFF S7 OFF S8 S9 OFF 485 Termination OFF DIP Switch Settings SW5 9 Panel Address SW3 OFF SW4 OFF S1 7 ...

Page 50: ...el Address S6 OFF S7 OFF S8 S9 ON 485 Termination ON Only Earth Ground EG one side of cable RS 485 Cable RJ45 4 000 ft 1 200 m max 24 AWG 2 twisted pairs with shield 120 ohm 23 pf HAS part no NCP2441 TN or CAT 7 S FTP Cable DIP Switch Settings SW 5 9 Panel Address SW3 ON Primary SW4 OFF S1 7 8 ON 485 Termination ON See RS 485 Cable note DIP Switch Settings SW 5 9 Panel Address SW3 OFF Secondary SW...

Page 51: ...ch Settings SW5 9 Panel Address SW3 OFF SW4 OFF S1 7 8 OFF 485 Termination OFF DIP Switch Settings SW5 9 Panel Address SW6 ON Primary SW4 OFF S1 7 8 ON 485 Termination ON Ethernet RS 485 4 000 ft Refer to MPA2 MPA2 Panel Connection Detail Diagram RS 485 Cable 4 000 ft 1 200 m max 24 AWG 2 twisted pairs with shield 120 ohm 23 pF Honeywell part no 3328 or CAT 7 S FTP Cable EG EG EG EG EG EG EG EG Ne...

Page 52: ... protection from unauthorized access 3 EVL connected MPA2 downstream panel communication has not been evaluated by UL EG EG EG EG MPA2 Primary MPA2 Panel Secondary NetAXS 123 Panel Secondary NetAXS 123 Panel Secondary MPA2 Panel Secondary ETHERNET SWITCH Terminal To NETWORK DIP Switch Settings SW3 ON SW9 ON SW1 10 ON OSDP SW1 10 OFF Wiegand SW2 4 8 OFF DIP Switch Settings SW3 OFF SW9 ON SW1 10 ON ...

Page 53: ...Router has not been evaluated by UL EG EG EG EG MPA2 Primary MPA2 Panel Secondary NetAXS 123 Panel Secondary NetAXS 123 Panel Secondary MPA2 Panel Secondary ROUTER To NETWORK CAT 7 S FTP Ethernet Connection with EVL Loop on Dedicated Network Terminal DIP Switch Settings SW3 ON SW9 ON SW1 10 ON OSDP SW1 10 OFF Wiegand SW2 4 8 OFF DIP Switch Settings SW3 OFF SW9 ON SW1 10 ON OSDP SW1 10 OFF Wiegand ...

Page 54: ...Primary in Location 1 to connect to TCP port 9876 in Locations 2 and 3 5 Controllers that are on a different subnetwork than the Primary which is likely the case for loops across multiple locations will NOT be automatically discovered by the Primary controller In EG EG EG MPA2 Panel Primary EG MPA2Panel Secondary MPA2 Panel Secondary NetAXS 123 Panel Secondary MPA2 Panel Secondary CAT 7 S FTP Ethe...

Page 55: ...s case it is recommended that you request an IP address reservation from your network provider or administrator This address will be needed when the user sets up the Primary controller There is a Manual Registration button on the EVL registration screen for this purpose 6 The Ethernet Switch has not been evaluated by UL ...

Page 56: ... The Form C SPDT relays are configured as Normally Open or Normally Closed outputs only Normally Open and Normally Closed contacts cannot be used simultaneously 5 3 Reader Interface Reader Power 12VDC nominal with 500mA maximum Current available for each door 2Reader Ports Reader LED Output Open collector driver capable of sinking up to 16mA Reader Tamper ADC input Reader Data Input Low Voltage CM...

Page 57: ...e for all external devices combined Notes Two readers per door can still be supported as long as the total current is within the external load capacity stated above You can either find the devices power consumption amounts by referring to the products documentation or by using a current meter Example If the total current consumption of your external devices exceeds the 1650 mA maximum current then...

Page 58: ...r or PoE switch with the shortest possible Ethernet cable length Amids pan power supply also known as a PoE power injector is an additional PoE power Class 4 can only be used by IEEE 802 3at Type 2 devices requiring valid Class 2 and Mark 2 currents for the power up stages 5 6 Mechanical Standard Enclosure dimensions Height 16 inches 412 0 mm Width 14 25 inches 362 0 mm and Depth 4 37 inches 111 m...

Page 59: ...ls Relay Outputs Twisted Pair Shielded CAT 6E 7 S FTP 22 24 150 m 1000 Ft Table 10 Reader Wiring Symbols Description CE marking is a certification mark that indicates conformity with health safety and environmental protection standards for products sold within the European Economic Area EEA The CE marking is the manufacturer s declaration that the product meets the requirements of the applicable E...

Page 60: ...ested and evaluated representative samples of the product and determined that it meets ULC s requirements In addition products are periodically checked by ULC at the manufacturing facility to make sure they continue to meet ULC requirements DIRECTIVE 2012 19 EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL on waste electrical and electronic equipment WEEE Art 14 2 5 This symbol on our product show...

Page 61: ...re version In case of urgency Rollback firmware downgrade will be allowed for a grace period of 30 days only 6 2 Firmware Upgrades Panel Requirements MPA2 panels must first be upgraded to the latest release firmware version Refer to the release notes for more information Note The secondary downstream EVL panels should be upgraded first and then the primary Primary panel s For detailed upgrade inst...

Page 62: ...r input The card is valid when it is in the card database on the panel and the current time and date conforms to the time zone associated with the card If it is not a valid card the door relay remains locked 7 2 Door Egress REX Door Lock Door Status Operation 1 Activate the door egress input REX 2 The panel energizes the door relay associated with the particular door egress input for a default tim...

Page 63: ...ocument 800 25395 B 61 8 0 Maintenance Perform the following maintenance on the MPA2 enclosure Change the backup battery every two to two and a half years Oil the lock once per year Note The power supply contains no serviceable parts There is no replaceable fuse inside the power supply ...

Page 64: ... have communications on the Ethernet port If you need to use that port to access the panel turn off the power including the battery change the switch setting and reapply the power Note that if the panel is normally not a Primary on a Multidrop communication bus then the Host RS 485 connection J17 18 should also be disconnected while DIP switch 3 is ON After completion of the Ethernet session turn ...

Page 65: ...upport Channel https www youtube com channel UCBEL6ouNV_LN5lEpYRujMTg featured Discover Customer Portal https honeywelldiscovertraining com Learning Management On Line Training Register for classroom training get product certified and more E mail Technical Support Who waits on hold anymore Submit an e mail support question and we will respond within 2 business days Schedule Technical Support Coord...

Page 66: ...w the status of a database service Notification Center Sign up to receive up to date product notifications Following are the tech support E mail IDs of different countries EMEA ITALY hsgittechsupport honeywell com UK hsguktechsupport honeywell com SPAIN hsgestechsupport honeywell com FRANCE hsgfrtechsupport honeywell com THE NETHERLANDS hsgnltechsupport honeywell com USA https www honeywellsystems...

Page 67: ...stems 135 W Forest Hill Avenue Oak Creek WI 53154 United States 800 323 4576 414 766 1798 Fax www honeywellaccess com Specifications subject to change without notice Honeywell All rights reserved Document 800 25395 Rev B ...

Reviews: