background image

Relion

®

 650 series

Transformer protection RET650

Commissioning Manual

Summary of Contents for ret650

Page 1: ...Relion 650 series Transformer protection RET650 Commissioning Manual...

Page 2: ......

Page 3: ...Document ID 1MRK 504 126 UEN Issued February 2011 Revision Product version 1 1 Copyright 2011 ABB All rights reserved...

Page 4: ...ed or disclosed only in accordance with the terms of such license Trademarks ABB and Relion are registered trademarks of ABB Group All other brand or product names mentioned in this document may be tr...

Page 5: ...cerning electrical equipment for use within specified voltage limits Low voltage directive 2006 95 EC This conformity is the result of tests conducted by ABB in accordance with the product standards E...

Page 6: ...roduct failure would create a risk for harm to property or persons including but not limited to personal injuries or death shall be the sole responsibility of the person or entity applying the equipme...

Page 7: ...ectrician is allowed to carry out the electrical installation National and local electrical safety regulations must always be followed The frame of the IED has to be carefully earthed Whenever changes...

Page 8: ......

Page 9: ...site acceptance testing 19 Commissioning checklist 19 Checking the power supply 20 Energizing the IED 20 Checking the IED operation 20 IED start up sequence 20 Setting up communication between PCM600...

Page 10: ...low impedance REFPDIF 41 Verifying the settings 41 Completing the test 42 High impedance differential protection HZPDIF 42 Verifying the settings 42 Completing the test 43 Testing current protection...

Page 11: ...PPDOP 57 Verifying the settings 57 Completing the test 58 Testing voltage protection functions 58 Two step undervoltage protection UV2PTUV 58 Verifying the setting 58 Completing the test 59 Two step o...

Page 12: ...Event counter CNTGGIO 76 Testing metering functions 76 Pulse counter PCGGIO 76 Exit test mode 76 Section 7 Commissioning and maintenance of the fault clearing system 79 Commissioning and maintenance...

Page 13: ...Changing and setting the password 88 Identifying IED application problems 88 Inspecting the wiring 89 Section 9 Glossary 93 Table of contents 5 Commissioning Manual...

Page 14: ...6...

Page 15: ...cess of testing an IED in a substation which is not in service The chapters are organized in chronological order in which the IED should be commissioned 1 2 Intended audience This manual addresses the...

Page 16: ...IEC07000220 V1 EN Figure 1 The intended use of manuals in different lifecycles The engineering manual contains instructions on how to engineer the IEDs using the different tools in PCM600 The manual...

Page 17: ...an also be used when calculating settings The technical manual contains application and functionality descriptions and lists function blocks logic diagrams input and output signals setting parameters...

Page 18: ...s the presence of a hazard which could result in electrical shock The warning icon indicates the presence of a hazard which could result in personal injury The caution icon indicates important informa...

Page 19: ...ted in bold for example Select Main menu Settings LHMI messages are shown in Courier font for example To save the changes in non volatile memory select Yes and press Parameter names are shown in itali...

Page 20: ...12...

Page 21: ...ce differential protection 2 2 2 2 Back up protection functions IEC 61850 Function block name ANSI Function description Transformer RET650 A01 2W 1CB RET650 A05 3W 1CB RET650 A07 OLTC Current protecti...

Page 22: ...block name ANSI Function description Transformer RET650 A01 2W 1CB RET650 A05 3W 1CB RET650 A07 OLTC Control QCBAY Bay control 1 1 1 LOCREM Handling of LR switch positions 1 1 1 LOCREMCTRL LHMI contro...

Page 23: ...ble logic blocks timer function block 40 40 40 AND Configurable logic blocks AND gate 280 280 280 SRMEMORY Configurable logic blocks set reset memory flip flop gate 40 40 40 RSMEMORY Configurable logi...

Page 24: ...IEC60870 5 103 1 1 1 I103FLTPROT Function status fault protection for IEC60870 5 103 1 1 1 I103IED IED status for IEC60870 5 103 1 1 1 I103SUPERV Supervison status for IEC60870 5 103 1 1 1 I103USRDEF...

Page 25: ...al event list 1 SELFSUPEVLST Self supervision with internal event list 1 SNTP Time synchronization 1 TIMESYNCHGEN Time synchronization 1 DTSBEGIN DTSEND TIMEZONE Time synchronization daylight saving 1...

Page 26: ...18...

Page 27: ...configuration Site acceptance testing SAT or commissioning testing is typically done to verify that the new installed IED is correctly set and connected to the power system SAT requires that the accep...

Page 28: ...ply of the IED to start it up This could be done in number of ways from energizing a whole cubicle to energizing a single IED Set the IED time if no time synchronization source is configured Check als...

Page 29: ...t be configured in both cases to enable communication The communication procedures are the same in both cases 1 If needed set the IP address for the IEDs 2 Set up the PC or workstation for a direct li...

Page 30: ...x Tx Rx Rx RJ 45 IED IEC09000096 V1 EN Figure 2 Point to point link between IED and PCM600 using a null modem cable The following description is an example valid for standard PCs using Microsoft Windo...

Page 31: ...the status window IEC09000356 1 en vsd IEC09000356 V1 EN Figure 4 Right click Local Area Connection and select Properties 3 Select the TCP IP protocol from the list of configured components using thi...

Page 32: ...1 en vsd IEC09000358 V1 EN Figure 6 Select Obtain an IP address automatically 5 Select Use the following IP address and define IP address and Subnet mask if the front port is used and if the IP addre...

Page 33: ...to the IED Establish a connection between PCM600 and the IED when an application configuration must be written to the IED When writing an application configuration to the IED the IED is automatically...

Page 34: ...nt transformer secondary loop DC resistance is within specification and that there are no high resistance joints in the CT winding or wiring Earthing check of the individual CT secondary circuits to v...

Page 35: ...plug handle is inserted it first blocks the trip and alarm circuits then it short circuits the CT secondary circuit and opens the VT secondary circuits making the IED available for secondary injectio...

Page 36: ...larity are in accordance with the IED specifications 3 10 2 Binary output circuits Preferably disconnect the binary output connector from the binary output cards Check all connected signals so that bo...

Page 37: ...ble GOOSE communication via the front port the parameter GOOSE in Main menu Configuration Communication Station communication IEC61850 8 1 must be set to Front To enable GOOSE communication via rear p...

Page 38: ...30...

Page 39: ...Check the disturbance report settings to ensure that the indications are correct For test functions and test and signal parameter names see the technical manual The correct initiation of the disturba...

Page 40: ...a three phase supply of currents and three phase voltage The magnitude and angle of currents and voltages should be possible to vary Check that the IED is prepared for test before starting the test s...

Page 41: ...circuits making IED terminals available for secondary injection Terminals 1 and 8 1 and 18 as well as 1 and 12 of the test switches RTXP8 RTXP18 and RTXP24 respectively are not disconnected as they su...

Page 42: ...the connection of the residual current conductor is correct Check that the input and output logical signals in the logic diagram for the function under test are connected to the corresponding binary i...

Page 43: ...us of the BLOCK input signal is equal to 0 for the function to be tested Event function blocks can also be individually blocked to ensure that no events are reported to a remote station during the tes...

Page 44: ...rimary values 4 Inject an unsymmetrical three phase voltage and current to verify that phases are correctly connected If some setting deviates check the analog input settings under Main menu Configura...

Page 45: ...ing protection functionality Each protection function must be tested individually by secondary injection Verify operating levels trip and timers Verify alarm and blocking signals Use the disturbance h...

Page 46: ...38...

Page 47: ...RE 6 1 2 Disturbance report settings When the IED is in test mode the disturbance report can be made active or inactive If the disturbance recorder is turned on during test mode recordings will be mad...

Page 48: ...ential functions T2WPDIF or T3WPDIF are unblocked 2 Connect the test set for injection of three phase currents to the current terminals of the IED which are connected to the CTs on the HV side of the...

Page 49: ...PDIF 87T Id 1 T2WPDIF for the function or for each individual function in a chain to be tested next Remember to set the parameter Blocked to Yes for each individual function that has been tested Conti...

Page 50: ...e angle and with polarity corresponding to an external fault 12 Increase the current to five times the operating value and check that the protection does not operate 13 Finally check that trip informa...

Page 51: ...test and without trip of the test set 8 Measure the operating time on the alarm output by connecting the stop of the test set to an output from tAlarm Inject a voltage 1 2 U Alarm and measure the alar...

Page 52: ...value below that of the setting 2 Increase the injected current until the TRIP signal appears 3 Switch the fault current off Observe Do not exceed the maximum permitted overloading of the current cir...

Page 53: ...d set the injection current to lag the polarizing voltage by an angle equal to 235 equal to 55 180 4 Increase the injected current and note the operated value of the tested step of the function 5 Decr...

Page 54: ...ues of the logical signals for EFPIOC are available on the local HMI under Main menu Tests Function status Current EFPIOC 50N IN 1 EFPIOC The Signal Monitoring in PCM600 shows the same signals that ar...

Page 55: ...slightly larger than the set minimum polarizing voltage default 1 of Ur and set the injection current to lag the voltage by an angle equal to the set reference characteristic angle AngleRCA if the fo...

Page 56: ...or each individual function that has been tested 6 4 5 Thermal overload protection two time constants TRPTTR Prepare the IED for verification of settings as outlined in 5 1 Preparing the IED to verify...

Page 57: ...m the service menu readings of thermal status and LOCKOUT that the lockout resets at the set percentage of heat content 14 Activate the digital input for cooling input signal to switch over to base cu...

Page 58: ...t of 3 or 2 out of 4 as set under Main menu Settings IED Settings Current CCRBRF 50BF 1 CCRBRF 1 Apply the fault condition including START of CCRBRF with a current below set IP 2 Repeat the fault cond...

Page 59: ...rip Off 1 Set RetripMode Retrip Off 2 Apply the fault condition including start of CCRBRF well above the set current value 3 Verify that no re trip but back up trip is achieved after set time 4 Discon...

Page 60: ...Choose the mode below which corresponds to the actual case Checking the case BuTripMode 1 out of 4 It is assumed that the earth fault current setting IN is below phase current setting IP 1 Set BuTrip...

Page 61: ...rent Contact is selected Checking the case with fault current above set value IP The operation shall be as in FunctionMode Current 1 Set FunctionMode Current Contact 2 Leave the inputs for CB close in...

Page 62: ...5 1 Preparing the IED to verify settings Values of the logical signals for CCRPLD are available on the local HMI under Main menu Tests Function status Current CCRPLD 52PD X CCRPLD The Signal Monitori...

Page 63: ...t are available on the local HMI 6 4 8 1 Verifying the settings The underpower protection shall be set to values according to the real set values to be used The test is made by means of injection of v...

Page 64: ...voltage to the set values in of IBase and UBase converted to secondary current and voltage The angle between the injected current and voltage shall be set equal to the set direction Angle1 angle for...

Page 65: ...ection shall be set to values according to the real set values to be used The test is made by means of injection of voltage and current where the amplitude of both current and voltage and the phase an...

Page 66: ...n menu Tests Function test modes Current GOPPDOP 32 P X GOPPDOP for the function or for each individual function in a chain to be tested next Remember to set the parameter Blocked to Yes for each indi...

Page 67: ...ion test modes Voltage UV2PTUV 27 2U 1 UV2PTUV for the function or for each individual function in a chain to be tested next Remember to set the parameter Blocked to Yes for each individual function t...

Page 68: ...ither to a single phase voltage input or to a residual voltage input with the start value below the set value U1 2 Slowly increase the value until ST1 appears 3 Note the operate value and compare it w...

Page 69: ...rily set the time delay tMin to 0 5s 8 Increase the voltage and note the V Hz operate value 9 Reduce the voltage slowly and note the reset value 10 Set the time delay to the correct value according to...

Page 70: ...1 The test above can be repeated to check the time to reset 2 The tests above can be repeated to test the frequency dependent inverse time characteristic Verification of the low voltage magnitude blo...

Page 71: ...their rated values 3 Slowly increase the frequency of the applied voltage until the START signal appears 4 Note the operate value and compare it with the set value 5 Decrease the frequency to rated o...

Page 72: ...l HMI under Main menu Tests Function status Frequency SAPFRC 81 df dt X SAPFRC The Signal Monitoring in PCM600 shows the same signals that are available on the local HMI 6 6 3 1 Verifying the settings...

Page 73: ...ill occur more and more seldom until there is one hour between save operations If the IED is restarted by turning auxiliary power off and back on then up to one hour of counter value increments will b...

Page 74: ...ntrol function Setting confirmation is an important step for voltage control in the installation and commissioning phase to ensure consistency of power systems base quantities alarm blocking condition...

Page 75: ...al These parameter settings can cause a Total Block Automatic Block or Alarm for a variety of system conditions including over and under voltage over current and tap changer failure It is important to...

Page 76: ...r Tap Control On and Transformer Voltage Control On Direct tap change control Main menu Settings IED Settings Control TCMYLTC 84 1 TCMYLTC Operation Automatic transformer voltage control Main menu Set...

Page 77: ...f this command will involve locating the allocated binary output for a low pulse command in the Signal Matrix in PCM600 and monitoring a positive from this output 6 Return the applied voltage to USet...

Page 78: ...than the Iblock setting and confirm the alarm or blocking condition is present on the local HMI If an automatic or total blocking condition occurs change the applied secondary voltage and confirm that...

Page 79: ...upper deadband limit U2 and wait for the issue of a lower command from the voltage control after the expiry of a constant or inverse time delay set by t2 8 Confirm that all follower transformers in t...

Page 80: ...V to LV side for Transformer 1 and LV to HV side for Transformer 2 6 Confirm that a circulating current is measured on the local HMI that is equal in magnitude to 5 of IBase for winding 2 which is def...

Page 81: ...d circulating current will cause a raise command to be issued for Transformer 2 and a lower command for Transformer 1 Magnitude and direction of circulating currents measured for each transformer can...

Page 82: ...parallel operation 1 Confirm that OperationPAR is set to MF for each transformer in the parallel group 2 Review the setting for VTmismatch and tVTmismatch 3 Inject a voltage UB equal to USet for Tran...

Page 83: ...An adequate time interval between the faults should be considered to overcome a reclaim time caused by the possible activation of the Autorecloser function SMBRREC The function must issue a three phas...

Page 84: ...a binary input to the counter under test and from outside apply pulses to the counter The speed of pulses must not exceed 10 per second Normally the counter will be tested in connection with tests on...

Page 85: ...the test mode folder 2 Change the On setting to Off Press the E key and the left arrow key 3 Answer YES press the E key and exit the menus 1MRK 504 126 UEN Section 6 Testing functionality 77 Commissi...

Page 86: ...78...

Page 87: ...equipment undergoes extensive testing and quality control in the ABB manufacturing program All types of IEDs and their integral components have been subject to extensive laboratory testing during the...

Page 88: ...functions where load currents is checked on the local HMI and in PCM600 The amplitudes and angles of all currents and voltages should be checked and the symmetry verified Directional functions have in...

Page 89: ...ulating grains of abrasive may be deposited on the contact surfaces and cause failure Make sure that all IEDs are equipped with covers 7 1 3 2 Maintenance tests To be made after the first half year of...

Page 90: ...tion The periodic maintenance test is done by secondary injection from a portable test set Each protection shall be tested according to the secondary injection test information for the specific protec...

Page 91: ...an alarm shall be achieved on the signal system after a delay of some seconds However remember to close the circuit directly after the test and tighten the terminal carefully Measurement of service cu...

Page 92: ...then putting it back into service with an open terminal with a removed fuse or open miniature circuit breaker with an open connection wrong setting and so on Thus a list should be prepared of all ite...

Page 93: ...external test device If the problem remains contact ABB for repair or replacement actions 8 1 2 Identifying runtime errors 1 Check the error origin from IED s internal event list Main menu Diagnostic...

Page 94: ...LHMI 2 Check the communication status of the rear port X1 via the LHMI in Main menu Test Function status Communication 1 DOSLAN1 Outputs The X1 communication port on the rear side of the IED is for op...

Page 95: ...nal Fault Real Time Clock Error Hardware error with the real time clock Internal Fault Runtime Exec Error One or more of the application threads are not working properly Internal Fault SW Watchdog Err...

Page 96: ...HMI menu under the event list The signal status data is found under the IED status and in the internal event list Table 5 Additional indications Warning indication Additional information Time Synch Er...

Page 97: ...g the Negation parameter is not recommended without special skills In PCM600 change the parameter CTStarPointn n the number on the current input under the parameter settings for each current input Che...

Page 98: ...D01 4711 A71D BBC76B60BA3D V1 EN Figure 9 Testing output contacts using the voltage drop method 1 Contact current 2 Contact voltage drop 3 Load 4 Supply voltage Section 8 1MRK 504 126 UEN Troubleshoot...

Page 99: ...the relay state manually 1 To set the IED to test mode select Main menu Tests IED testmode1 TESTMODE TestMode and set the parameter to On 2 To operate or force the output relay to operate select and...

Page 100: ...achieved when the BO is set to Forced or operated on the LHMI Set the parameter TestMode to Off after completing these tests The Start LED stops flashing when the relay is no longer in test mode An in...

Page 101: ...Telegraph and Telephony A United Nations sponsored standards body within the International Telecommunications Union CCVT Capacitive Coupled Voltage Transformer Class C Protection Current Transformer c...

Page 102: ...tch Small switch mounted on a printed circuit board DI Digital input DLLB Dead line live bus DNP Distributed Network Protocol as per IEEE ANSI Std 1379 2000 DR Disturbance recorder DRAM Dynamic random...

Page 103: ...BR connector type Plastic fiber connector HMI Human machine interface HSAR High speed autoreclosing HV High voltage HVDC High voltage direct current IDBS Integrating deadband supervision IEC Internati...

Page 104: ...20 Ingression protection according to IEC standard level 20 IP 40 Ingression protection according to IEC standard level 40 IP 54 Ingression protection according to IEC standard level 54 IRF Internal f...

Page 105: ...PT ratio Potential transformer or voltage transformer ratio PUTT Permissive underreach transfer trip RASC Synchrocheck relay COMBIFLEX RCA Relay characteristic angle RFPP Resistance for phase to phase...

Page 106: ...orking and encompasses both network layer and transport layer protocols While TCP and IP specify two protocols at specific protocol layers TCP IP is often used to refer to the entire US Department of...

Page 107: ...k and uses the Gregorian calendar It is used for aeroplane and ship navigation where it is also sometimes known by the military name Zulu time Zulu in the phonetic alphabet stands for Z which stands f...

Page 108: ...100...

Page 109: ...101...

Page 110: ...act us ABB AB Substation Automation Products SE 721 59 V ster s Sweden Phone 46 0 21 32 50 00 Fax 46 0 21 14 69 18 www abb com substationautomation 1MRK 504 126 UEN Copyright 2011 ABB All rights reser...