background image

© Copyright 2015 ABB, All rights reserved 

 

 

User Manual 

Battery cabinet 

for PowerValue 11-31T  10-20kVA 

 

 

 

 

 

 

 

 

 

 

 

Summary of Contents for Battery cabinet for PowerValue 11-31T 10-20 kVA

Page 1: ... Copyright 2015 ABB All rights reserved User Manual Battery cabinet for PowerValue 11 31T 10 20kVA ...

Page 2: ...ck and foreign objects Installation and service have to be done by the manufacturer s qualified technicians or their certified service partners OPERATIONS INSIDE THE BATTERY CABINET MUST BE PERFORMED BY A SERVICE ENGINEER FROM THE MANUFACTURER OR FROM AN AGENT CERTIFIED BY THE MANUFACTURER This user manual contains guidelines to installing the battery cabinet and is intended for people who plan th...

Page 3: ...Modifications reserved Page 3 12 Contents 1 Safety rules 4 2 Installation 5 3 Electrical drawing 10 4 Revision history 11 ...

Page 4: ... This manual contains important instructions that should be followed during installation and operation of the battery cabinet This product is designed for commercial industrial use only with UPS systems It is not intended for use with life support and other designated critical devices Do not exceed battery cabinets or UPS rating labels As the battery life depends on the ambient temperature for the...

Page 5: ...ISCONNECT THE CHARGING SOURCE PRIOR TO CONNECTING OR DISCONNECTING BATTERY TERMINALS f DETERMINE IF BATTERY IS INADVERTENTLY GROUNDED IF INADVERTENTLY GROUNDED REMOVE SOURCE FROM GROUND CONTACT WITH ANY PART OF A GROUNDED BATTERY CAN RESULT IN ELECTRAL SHOCK THE LIKELIHOOD OF SUCH SHOCK CAN BE REDUCED IF SUCH GROUNDS ARE REMOVED DURING INSTALLATION AND MAINTENANCE APLLICABLE TO EQUIPMENT AND REMOT...

Page 6: ...INTERNAL SERVICE ACTIVITY MAKE CERTAIN ALL DISCONNECT DEVICES OF INSTALLED BATTERIES ARE OPEN BEFORE CONNECTING OR DISCONNECTING AN ADDITIONAL BATTERY CABINET TO BATTERY VOLTAGE BUS For a correct installation and cabling of the battery cabinet please follow step by step the instructions described below 1 Remove the two side and upper panel covers from the unit fig 1 2 Remove the 4 metallic bars 2 ...

Page 7: ...4 5 Connect all the batteries on the plastic tray together by using the provided links short cables fig 5 6 Starting from the top left shelf A3 of the back side of the unit fig 8 connect the correct cables on the 2 connectors ends of the battery tray fig 6 Each cable is labelled refer to the electrical drawing in chapter 3 7 Repeat this cabling procedure for all the battery trays by following the ...

Page 8: ...ide the unit by using the correct shelf how described on the chapter 3 Electrical drawing fig 7 and fig 8 Fig 7 Fig 8 9 Connect all the shelf s together how described on the chapter 3 Electrical drawing fig 10 10 Re assemble all the 4 metallic bars on the unit fig 9 Fig 9 Fig 10 ...

Page 9: ... use a multimeter to check the correct voltage of the unit that should be approx 288V 12 If the test works fine you can close the unit by re assemble all the covers and connect the battery cabinet with a UPS for more information refer to the chapter 4 3 2 of the user manual Fig 11 ...

Page 10: ...Modifications reserved Page 10 12 3 Electrical drawing ...

Page 11: ...Modifications reserved Page 11 12 4 Revision history Revision number Chapter Description Date A N A First release 15 09 2015 ...

Page 12: ...Contact us www abb com ups ups sales ch abb com Copyright ABB All rights reserved Specification subjects to change without notice ...

Reviews: